The Patent Finder

Maintenance fees coming due

China National Petroleum Corporation

21 maintenance fees come due in the 12 months from Nov 25, 2026, the next on Dec 4, 2026. Unpaid by Jun 4, 2027, that one lapses early.
A maintenance fee does not end a patent on its due date. It falls due at 3.5, 7.5 and 11.5 years from grant, and the patent lapses only if the fee is still unpaid at the end of the six month grace period that follows.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
PatentTitleHolderStatusFee dueLapses if unpaidExpiresConfidence
US 10,309,171Coiled Tubing Reel and Coiled Tubing Vehicle
In force
Fee due Dec 4, 2026
Lapses if unpaid Jun 4, 2027
 · High confidence
Jianghan Machinery Research Institute Limited Company of CNPC, China National Petroleum Corporation and CNPC Engineering Technology R&D Company LimitedIn forceDec 4, 2026Jun 4, 2027High confidence
US 10,329,858Coiled Tubing Unit
In force
Fee due Dec 25, 2026
Lapses if unpaid Jun 25, 2027
 · High confidence
Jianghan Machinery Research Institute Limited Company of CNPC, China National Petroleum Corporation and CNPC Engineering Technology R&D Company LimitedIn forceDec 25, 2026Jun 25, 2027High confidence
US 10,392,552Water-Based Drilling Fluid for Protecting Fractured Reservoirs, and Preparation Method and Use Thereof
In force
Fee due Feb 27, 2027
Lapses if unpaid Aug 27, 2027
 · High confidence
China University of Petroleum (East China), CNPC Engineering Technology R&D Company Limited and China National Petroleum CorporationIn forceFeb 27, 2027Aug 27, 2027High confidence
US 9,127,655Liquid Nitrogen Pump Equipment Load Testing and Experimenting Apparatus and Testing and Experimenting Method Thereof
In force
Fee due Mar 8, 2027
Lapses if unpaid Sep 8, 2027
 · High confidence
China National Petroleum Corporation and CNPC Bohai Equipment Manufacturing Co., Ltd.In forceMar 8, 2027Sep 8, 2027High confidence
US 10,408,042Methods of Well Trajectory and Drilling Optimized Control for Fracture-Vuggy Carbonate Formation
In force
Fee due Mar 10, 2027
Lapses if unpaid Sep 10, 2027
 · High confidence
China National Petroleum Corporation and CNPC Engineering Technology R&D Company LimitedIn forceMar 10, 2027Sep 10, 2027High confidence
US 10,409,251Automatic Inspection and Monitoring Method Based on Time Domain Slotting Control
In force
Fee due Mar 10, 2027
Lapses if unpaid Sep 10, 2027
 · High confidence
China National Petroleum Corporation and BGP Inc., China National Petroleum CorporationIn forceMar 10, 2027Sep 10, 2027High confidence
US 11,753,581Delayed Gelation Polymer System
In force
Fee due Mar 12, 2027
Lapses if unpaid Sep 13, 2027
 · High confidence
CNPC USA Corporation, Beijing Huamei, Inc. and China National Petroleum CorporationIn forceMar 12, 2027Sep 13, 2027High confidence
US 10,436,920Monitoring System for Use in Seismic Instrument Arrangement in Petroleum Exploration
In force
Fee due Apr 8, 2027
Lapses if unpaid Oct 8, 2027
 · High confidence
China National Petroleum Corporation and BGP Inc., China National Petroleum CorporationIn forceApr 8, 2027Oct 8, 2027High confidence
US 10,450,801Casing Windowing Method and Tool Using Coiled Tubing
In force
Fee due Apr 22, 2027
Lapses if unpaid Oct 22, 2027
 · High confidence
China National Petroleum Corporation and CNPC Drilling Research InstituteIn forceApr 22, 2027Oct 22, 2027High confidence
US 9,194,970Method of Poles Configuration with Four Poles Inter-Combination for Marine Electromagnetic Surveying
In force
Fee due May 24, 2027
Lapses if unpaid Nov 24, 2027
 · High confidence
China National Petroleum Corporation and BGP Inc., China National Petroleum CorporationIn forceMay 24, 2027Nov 24, 2027High confidence
11 more maintenance fees coming due in the 12 months from Nov 25, 2026 · Pro
10 of 21 patents shown. Soonest fee due date first, then patent number.
Pro members see every patent with a maintenance fee coming due: number, title, status, the due date, and the date it lapses if the fee goes unpaid through the grace period.
Upgrade to Pro
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
The Patent Finder CompaniesExpirationsCalculatorWatchlistPricing MethodologyCorrectionsLegalPrivacysupport@thepatentfinder.com Updated Nov 25, 2026 · includes USPTO assignment data published Nov 24, 2026, status data published Nov 25, 2026 and grant & fee data published Nov 24, 2026 (weekly) Part of 137 Finder · © 2026 137 Finder LLC · Sources cited