China University of Mining and Technology
51 maintenance fees come due in the 12 months from Nov 24, 2026, the next on Nov 28, 2026. Unpaid by May 28, 2027, that one lapses early.
A maintenance fee does not end a patent on its due date. It falls due at 3.5, 7.5
and 11.5 years from grant, and the patent lapses only if the fee is still unpaid at the end of the
six month grace period that follows.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Holder | Status | Fee due | Lapses if unpaid | Expires | Confidence |
|---|---|---|---|---|---|---|---|
| US 10,301,939 | Method for Designing Supporting Parameters of Transition Support for Mixed Mining Face of Filling and Fully-Mechanized Mining China University of Mining and Technology, Pingdingshan Tianan Coal Mining Co., Ltd., China Pingmei Shenma Energy and Chemical Industry Group Co., Ltd. and Xuzhou Zhongan Science & Technology Co., Ltd. In force Fee due Nov 28, 2026 Lapses if unpaid May 28, 2027 · High confidence | China University of Mining and Technology, Pingdingshan Tianan Coal Mining Co., Ltd., China Pingmei Shenma Energy and Chemical Industry Group Co., Ltd. and Xuzhou Zhongan Science & Technology Co., Ltd. | In force | Nov 28, 2026 | May 28, 2027 | High confidence | |
| US 11,673,747 | Method for Constructing Pumping-Injection Well of Groundwater Reservoir in Dump of Open-Pit Mine In force Fee due Dec 13, 2026 Lapses if unpaid Jun 14, 2027 · High confidence | China University of Mining and Technology and CHN Energy Investment Group Co.,Ltd. | In force | Dec 13, 2026 | Jun 14, 2027 | High confidence | |
| US 11,674,393 | Method for Constructing Dam Inside Dump of Inner-Dump Strip Mine China University of Mining and Technology, State Energy Investment Group Co. Ltd. and Jiangsu Vocational Institute of Architectural Technology In force Fee due Dec 13, 2026 Lapses if unpaid Jun 14, 2027 · High confidence | China University of Mining and Technology, State Energy Investment Group Co. Ltd. and Jiangsu Vocational Institute of Architectural Technology | In force | Dec 13, 2026 | Jun 14, 2027 | High confidence | |
| US 11,688,057 | Method and System for Quickly Matching Image Features Applied to Mine Machine Vision In force Fee due Dec 27, 2026 Lapses if unpaid Jun 28, 2027 · High confidence | China University of Mining and Technology | In force | Dec 27, 2026 | Jun 28, 2027 | High confidence | |
| US 11,691,846 | Hoisting Container Pose Control Method of Double-Rope Winding Type Ultra-Deep Vertical Shaft Hoisting System In force Fee due Jan 4, 2027 Lapses if unpaid Jul 6, 2027 · High confidence | China University of Mining and Technology | In force | Jan 4, 2027 | Jul 6, 2027 | High confidence | |
| US 11,691,854 | Bidirectional Anti-Slipping Apparatus in Monorail Crane Based on Inner Ratchet Mechanism China University of Mining and Technology and Xuzhou Liren Monorail Transportation Equipment Co., Ltd. In force Fee due Jan 4, 2027 Lapses if unpaid Jul 6, 2027 · High confidence | China University of Mining and Technology and Xuzhou Liren Monorail Transportation Equipment Co., Ltd. | In force | Jan 4, 2027 | Jul 6, 2027 | High confidence | |
| US 10,352,167 | Process Method for Withdrawing and Recovering Mechanical Constant-Resistance Single Prop In force Fee due Jan 16, 2027 Lapses if unpaid Jul 16, 2027 · High confidence | China University of Mining and Technology | In force | Jan 16, 2027 | Jul 16, 2027 | High confidence | |
| US 10,370,942 | Method for Integrated Drilling, Flushing, Slotting and Thermal Injection for Coalbed Gas Extraction In force Fee due Feb 6, 2027 Lapses if unpaid Aug 6, 2027 · High confidence | China University of Mining and Technology | In force | Feb 6, 2027 | Aug 6, 2027 | High confidence | |
| US 11,718,792 | Fly Ash-Based Environmentally-Friendly Hydrogel with High Water Retention for Preventing and Controlling Spontaneous Combustion of Coal in Mine and Preparation Method Thereof In force Fee due Feb 8, 2027 Lapses if unpaid Aug 9, 2027 · High confidence | China University of Mining and Technology | In force | Feb 8, 2027 | Aug 9, 2027 | High confidence | |
| US 11,719,841 | Timing alignment method for data acquired by monitoring units of borehole-surface micro-seismic monitoring system In force Fee due Feb 8, 2027 Lapses if unpaid Aug 9, 2027 · High confidence | China University of Mining and Technology and Xuzhou Hongyi Technology Development Co., Ltd. | In force | Feb 8, 2027 | Aug 9, 2027 | High confidence | |
| 41 more maintenance fees coming due in the 12 months from Nov 24, 2026 · Pro | |||||||
10 of 51 patents shown. Soonest fee due date first, then patent number.
Pro members see every patent with a maintenance fee coming due: number, title, status, the due date, and the date it lapses if the fee goes unpaid through the grace period.
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.