China University of Petroleum (East China)
51 maintenance fees come due in the 12 months from Nov 25, 2026, the next on Dec 27, 2026. Unpaid by Jun 28, 2027, that one lapses early.
A maintenance fee does not end a patent on its due date. It falls due at 3.5, 7.5
and 11.5 years from grant, and the patent lapses only if the fee is still unpaid at the end of the
six month grace period that follows.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Holder | Status | Fee due | Lapses if unpaid | Expires | Confidence |
|---|---|---|---|---|---|---|---|
| US 11,685,683 | High-Strength Geopolymer Hollow Microsphere, Preparation Method Thereof and Phase Change Energy Storage Microsphere In force Fee due Dec 27, 2026 Lapses if unpaid Jun 28, 2027 · High confidence | China University of Petroleum (East China) | In force | Dec 27, 2026 | Jun 28, 2027 | High confidence | |
| US 10,337,267 | Control Method and Control Device for Drilling Operations In force Fee due Jan 2, 2027 Lapses if unpaid Jul 2, 2027 · High confidence | China University of Petroleum (East China) | In force | Jan 2, 2027 | Jul 2, 2027 | High confidence | |
| US 10,343,128 | Reaction-Regeneration Device and Process for Alkane Dehydrogenation to Alkene In force Fee due Jan 9, 2027 Lapses if unpaid Jul 9, 2027 · High confidence | China University of Petroleum (East China) | In force | Jan 9, 2027 | Jul 9, 2027 | High confidence | |
| US 10,344,576 | Method Used for Exploiting Natural Gas Hydrate Reservoir In force Fee due Jan 9, 2027 Lapses if unpaid Jul 9, 2027 · High confidence | China University of Petroleum (East China) | In force | Jan 9, 2027 | Jul 9, 2027 | High confidence | |
| US 11,702,933 | Method for Determining Vertical Well Stratified Fracturing Crack Lengths Based on Interlayer Equilibrium Displacement China University of Petroleum (East China) and Research Institute of Exploration and Development, Shengli Oilfield Branch, Sinopec In force Fee due Jan 18, 2027 Lapses if unpaid Jul 19, 2027 · High confidence | China University of Petroleum (East China) and Research Institute of Exploration and Development, Shengli Oilfield Branch, Sinopec | In force | Jan 18, 2027 | Jul 19, 2027 | High confidence | |
| US 11,708,527 | Methods for Preparing Liquid-Solid Phase Change Proppant with a Controllable Particle Size Based on Emulsified Resin In force Fee due Jan 25, 2027 Lapses if unpaid Jul 26, 2027 · High confidence | China University of Petroleum (East China) | In force | Jan 25, 2027 | Jul 26, 2027 | High confidence | |
| US 10,371,859 | Method for Simulation of Microscopic Flow of Pre-Crosslinked Gel Suspension Liquid in Porous Medium In force Fee due Feb 6, 2027 Lapses if unpaid Aug 6, 2027 · High confidence | China University of Petroleum (East China) | In force | Feb 6, 2027 | Aug 6, 2027 | High confidence | |
| US 11,719,658 | Design Method of Cement for Well Cementing in Penetrated Hydrate Layer In force Fee due Feb 8, 2027 Lapses if unpaid Aug 9, 2027 · High confidence | China University of Petroleum (East China) | In force | Feb 8, 2027 | Aug 9, 2027 | High confidence | |
| US 10,392,552 | Water-Based Drilling Fluid for Protecting Fractured Reservoirs, and Preparation Method and Use Thereof China University of Petroleum (East China), CNPC Engineering Technology R&D Company Limited and China National Petroleum Corporation In force Fee due Feb 27, 2027 Lapses if unpaid Aug 27, 2027 · High confidence | China University of Petroleum (East China), CNPC Engineering Technology R&D Company Limited and China National Petroleum Corporation | In force | Feb 27, 2027 | Aug 27, 2027 | High confidence | |
| US 10,408,014 | Well Killing Method and Device for a Fractured Formation Without Safety Pressure Window by Five-Step Bullheading In force Fee due Mar 10, 2027 Lapses if unpaid Sep 10, 2027 · High confidence | China University of Petroleum (East China) | In force | Mar 10, 2027 | Sep 10, 2027 | High confidence | |
| 41 more maintenance fees coming due in the 12 months from Nov 25, 2026 · Pro | |||||||
10 of 51 patents shown. Soonest fee due date first, then patent number.
Pro members see every patent with a maintenance fee coming due: number, title, status, the due date, and the date it lapses if the fee goes unpaid through the grace period.
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.