Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
Recorded under 2 name spellings.
0
Ending by 2030
Aug 2037
Next term end
When these terms end
Held patents by the year their term ends
20262027202820292030203120322033203420352036203720382039204020412042204320442045
Fee deadlines
Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
- 1 fee due Oct 16, 2027The maintenance fee for Recycling Treatment Equipment for Recycling Heavy Metals from Complexed Heavy Metal Wastewater (US 11,958,766) comes due Oct 16, 2027. Unpaid by Apr 17, 2028, it lapses early.
Recent changes
- 1 of the patents on this record was granted since Aug 26, 2026
- Sep 8 US 12,729,995 Infrared Vision Positioning Method for Concrete Pumping Liquid Level in Tube of Steel Tubular Arch Bridge
- 1 term has ended since Aug 26, 2026
- Oct 14 US 8,858,109 Cosmetics Applicators · lapsed on the fee record
Patents held now
Soonest term end first. Each date below is computed on that patent's own page, which shows the rule, the adjustments and the fee history it was derived from.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 10,895,052 | Desert or sand control method In force · USPTO record | In force | USPTO record | |
| US 11,958,766 | Recycling Treatment Equipment for Recycling Heavy Metals from Complexed Heavy Metal Wastewater In force · High confidence | In force | High confidence | |
| US 12,229,481 | Construction method and system for hydrodynamic joint computation model, device, and medium In force · USPTO record | In force | USPTO record | |
| US 12,392,594 | Efficient and energy-saving blasting method based on notched blast hole In force · USPTO record | In force | USPTO record | |
| US 12,624,509 | Method for Regulating Confluence of Tributaries with Large Drop Difference and Large Angle into Trunk Canal In force · High confidence | In force | High confidence | |
| US 12,503,572 | Efficient phosphorus-containing toughening reactive flame retardant and preparation method thereof, and flame-retardant thermosetting resin In force · USPTO record | In force | USPTO record | |
| US 12,462,073 | Method for probabilistic assessment of seismic resistance of long-span arch bridge based on time-frequency hybrid computation In force · USPTO record | In force | USPTO record | |
| US 12,729,995 | Infrared Vision Positioning Method for Concrete Pumping Liquid Level in Tube of Steel Tubular Arch Bridge In force · High confidence | In force | High confidence | |
| US 12,522,988 | Externally Encased Prefabricated Uhpc Slab Arch Bridge with Concrete-Filled Steel Tube Stiff Skeleton In force · High confidence | In force | High confidence | |
| US 12,493,727 | Method for preparing small-scale model of buckling-controlled brace device with rotationally symmetric cross section In force · USPTO record | In force | USPTO record |
Also on record, not counted in the 11: 1 lapsed for an unpaid fee. List them
Sources and methods
Compiled from the USPTO record, grants, published applications and recorded assignments, not yet reviewed by hand.
How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
Published applications
US patent applications published under this name that have not become patents. An application is published about eighteen months after its earliest filing; one that has not been published is in no public record.
1 pending · 1 abandoned · 2 no status recorded