The Patent Finder

Echogen Power Systems (Delawre), Inc.

22 patents currently held · Updated Nov 17, 2026
1 more in force is now held by another company
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.

Recorded under 3 name spellings.

0
Ending by 2030
Feb 2031
Next term end

When these terms end

Held patents by the year their term ends
20262027202820292030203120322033203420352036203720382039204020412042204320442045

Fee deadlines

Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
  • 1 fee due May 12, 2027
    The maintenance fee for Systems and methods for controlling the pressure of a working fluid at an inlet of a pressurization device of a heat engine system (US 10,472,994) comes due May 12, 2027. Unpaid by Nov 12, 2027, it lapses early.
  • 1 fee due Jun 3, 2027
    The maintenance fee for Systems and methods for balancing thrust loads in a heat engine system (US 10,495,098) comes due Jun 3, 2027. Unpaid by Dec 3, 2027, it lapses early.
  • 1 fee due Aug 25, 2027
    The maintenance fee for Active thrust management of a turbopump within a supercritical working fluid circuit in a heat engine system (US 10,570,777) comes due Aug 25, 2027. Unpaid by Feb 25, 2028, it lapses early.

Which patents, and when each one lapses · Pro

Recent changes

Nothing was recorded against this company's patents in the last 90 days.

Patents held now

Soonest term end first. Each date below is computed on that patent's own page, which shows the rule, the adjustments and the fee history it was derived from.
PatentTitleStatus Expires Confidence
US 9,458,738Heat engine and heat to electricity systems and methods with working fluid mass management control
In force
 · From the USPTO record
In forceFrom the USPTO record
US 9,863,282Automated mass management control
In force
 · From the USPTO record
In forceFrom the USPTO record
US 9,410,449Driven starter pump and start sequence
In force
 · From the USPTO record
In forceFrom the USPTO record
US 9,091,278Supercritical Working Fluid Circuit with a Turbo Pump and a Start Pump in Series Configuration
In force
 · High confidence
In forceHigh confidence
US 9,341,084Supercritical carbon dioxide power cycle for waste heat recovery
In force
 · From the USPTO record
In forceFrom the USPTO record
US 9,863,287Heat engine system with a supercritical working fluid and processes thereof
In force
 · From the USPTO record
In forceFrom the USPTO record
US 9,752,460Process for controlling a power turbine throttle valve during a supercritical carbon dioxide rankine cycle
In force
 · From the USPTO record
In forceFrom the USPTO record
US 9,638,065Methods for reducing wear on components of a heat engine system at startup
In force
 · From the USPTO record
In forceFrom the USPTO record
US 10,077,683Mass management system for a supercritical working fluid circuit
In force
 · From the USPTO record
In forceFrom the USPTO record
US 9,932,861Systems and Methods for Controlling Backpressure in a Heat Engine System Having Hydrostaic Bearings
In force
 · High confidence
In forceHigh confidence
10 of 22 patents shown.
Pro members see all 22.
Pro members: see all 22 patents
Also on record, not counted in the 22: 1 patent in force now held by others · 1 lapsed for an unpaid fee. List them

Sources and methods

Compiled from the USPTO record, grants, published applications and recorded assignments, not yet reviewed by hand. How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
The Patent Finder CompaniesExpirationsCalculatorWatchlistPricing MethodologyCorrectionsLegalPrivacysupport@thepatentfinder.com Updated Nov 17, 2026 · includes USPTO assignment data published Nov 16, 2026, status data published Nov 17, 2026 and grant & fee data published Nov 17, 2026 (weekly) Part of 137 Finder · © 2026 137 Finder LLC · Sources cited