Echogen Power Systems (Delawre), Inc.
1 more in force is now held by another company
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
Recorded under 3 name spellings.
0
Ending by 2030
Feb 2031
Next term end
When these terms end
Held patents by the year their term ends
20262027202820292030203120322033203420352036203720382039204020412042204320442045
Fee deadlines
Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
- 1 fee due May 12, 2027The maintenance fee for Systems and methods for controlling the pressure of a working fluid at an inlet of a pressurization device of a heat engine system (US 10,472,994) comes due May 12, 2027. Unpaid by Nov 12, 2027, it lapses early.
- 1 fee due Jun 3, 2027The maintenance fee for Systems and methods for balancing thrust loads in a heat engine system (US 10,495,098) comes due Jun 3, 2027. Unpaid by Dec 3, 2027, it lapses early.
- 1 fee due Aug 25, 2027The maintenance fee for Active thrust management of a turbopump within a supercritical working fluid circuit in a heat engine system (US 10,570,777) comes due Aug 25, 2027. Unpaid by Feb 25, 2028, it lapses early.
Recent changes
Nothing was recorded against this company's patents in the last 90 days.
Patents held now
Soonest term end first. Each date below is computed on that patent's own page, which shows the rule, the adjustments and the fee history it was derived from.
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 9,458,738 | Heat engine and heat to electricity systems and methods with working fluid mass management control In force · From the USPTO record | In force | From the USPTO record | |
| US 9,863,282 | Automated mass management control In force · From the USPTO record | In force | From the USPTO record | |
| US 9,410,449 | Driven starter pump and start sequence In force · From the USPTO record | In force | From the USPTO record | |
| US 9,091,278 | Supercritical Working Fluid Circuit with a Turbo Pump and a Start Pump in Series Configuration In force · High confidence | In force | High confidence | |
| US 9,341,084 | Supercritical carbon dioxide power cycle for waste heat recovery In force · From the USPTO record | In force | From the USPTO record | |
| US 9,863,287 | Heat engine system with a supercritical working fluid and processes thereof In force · From the USPTO record | In force | From the USPTO record | |
| US 9,752,460 | Process for controlling a power turbine throttle valve during a supercritical carbon dioxide rankine cycle In force · From the USPTO record | In force | From the USPTO record | |
| US 9,638,065 | Methods for reducing wear on components of a heat engine system at startup In force · From the USPTO record | In force | From the USPTO record | |
| US 10,077,683 | Mass management system for a supercritical working fluid circuit In force · From the USPTO record | In force | From the USPTO record | |
| US 9,932,861 | Systems and Methods for Controlling Backpressure in a Heat Engine System Having Hydrostaic Bearings In force · High confidence | In force | High confidence |
Also on record, not counted in the 22: 1 patent in force now held by others · 1 lapsed for an unpaid fee. List them
Sources and methods
Compiled from the USPTO record, grants, published applications and recorded assignments, not yet reviewed by hand.
How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.