Framatome
43 more in force are now held by other companies
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
Recorded under 5 name spellings.
Previously recorded as Areva Inc. (to 2018)
1
Ending by 2030
Sep 2030
Next term end
When these terms end
Held patents by the year their term ends
20262027202820292030203120322033203420352036203720382039204020412042204320442045
Fee deadlines
Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
- 2 fees due Dec 6 to 20, 2026 · next Dec 6
- 2 fees due Jan 4 to 30, 2027 · next Jan 4
- 4 fees due Apr 8 to 17, 2027 · next Apr 8
- 1 fee due May 14, 2027The maintenance fee for Equipment for Producing Nuclear Fuel Powder (US 11,817,224) comes due May 14, 2027. Unpaid by Nov 15, 2027, it lapses early.
- 1 fee due Aug 18, 2027The maintenance fee for Tube Leak Repair Clamp Sealing Apparatus for Use in a Nuclear Power Plant (US 10,563,808) comes due Aug 18, 2027. Unpaid by Feb 18, 2028, it lapses early.
- 1 fee due Sep 1, 2027The maintenance fee for Apparatus for Automated Positioning of Eddy Current Test Probe (US 9,273,985) comes due Sep 1, 2027. Unpaid by Mar 1, 2028, it lapses early.
- 2 fees due Oct 2 to 28, 2027 · next Oct 2
- 1 fee due Nov 12, 2027The maintenance fee for Method for Detecting a Defect on a Surface by Multidirectional Lighting and Associated Device (US 10,648,920) comes due Nov 12, 2027. Unpaid by May 12, 2028, it lapses early.
Recent changes
- 6 of the patents on this record were granted since Aug 25, 2026
- Nov 10 US 12,793,864 Floating Maintenance Platform for Nuclear Facility
- Nov 3 US 12,784,922 Nuclear Fuel Assembly Bottom End Part Debris Filter and Method of Manufacturing Such a Debris Filter
- Oct 27 US 12,776,423 Nuclear Fuel Assembly Manufacturing Method, Nuclear Fuel Assembly Manufacturing Plant and Method of Expanding Such a Plant
- Oct 20 US 12,770,752 Storage Container for Uranium Oxide Powder
- Sep 8 US 12,731,701 Platform and Platform System for Nuclear Power Plant
- Sep 8 US 12,731,078 Probabilistic Evaluation of Fastener Degradation in Nuclear Power Plants
Patents held now
Soonest term end first. Each date below is computed on that patent's own page, which shows the rule, the adjustments and the fee history it was derived from.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 9,273,985 | Apparatus for Automated Positioning of Eddy Current Test Probe In force · High confidence | In force | High confidence | |
| US 10,636,131 | Inspection Video Radiation Filter In force · Medium confidence | In force | Medium confidence | |
| US 8,746,089 | Apparatus for Automated Positioning of Eddy Current Test Probe In force · High confidence | In force | High confidence | |
| US 10,847,275 | Method for Producing Nuclear Fuel Products by Cold Spraying a Core Comprising Aluminum and Low Enriched Uranium In force · Medium confidence | In force | Medium confidence | |
| US 9,964,399 | Non-Destructive Mapping of Surface Condition to Evaluate Wear Conditions In force · High confidence | In force | High confidence | |
| US 10,163,533 | Control Rod Drive Mechanism Outer Diameter Seal Ultra High Pressure Cavitation Peening In force · High confidence | In force | High confidence | |
| US 11,170,905 | Nuclear Fuel Claddings, Production Method Thereof and Uses of Same Against Oxidation/Hydriding In force · High confidence | In force | High confidence | |
| US 10,436,227 | Sealing Device for Jet Pump Slip Joints In force · High confidence | In force | High confidence | |
| US 10,363,631 | Neutron Irradiated Material Repair In force · High confidence | In force | High confidence | |
| US 11,486,021 | Method of Peening an Obstructed Region of a Metal Assembly In force · High confidence | In force | High confidence |
Also on record, not counted in the 80: 43 patents in force now held by others · 16 lapsed for an unpaid fee · 519 ended at full term. List them
Sources and methods
Compiled from the USPTO record, grants, published applications and recorded assignments, not yet reviewed by hand.
How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
Published applications
US patent applications published under this name that have not become patents. An application is published about eighteen months after its earliest filing; one that has not been published is in no public record.
17 pending · 5 abandoned
Showing 1 to 10 of 22, newest filing first. An application has no patent term. A term is computed when and if it grants, and appears on that patent's own page. Where no title is shown, the bulk publication record carries none and this site holds no USPTO file history for that application.
| Application | Title | Filed | Status |
|---|---|---|---|
| 18/584,512 | Method of Stabilizing a Lower End of a Thermal Shield Surrounding a Core Barrel of a Nuclear Reactor | Feb 22, 2024 | Pending |
| 18/723,865 | Nuclear Fuel Cladding and Method for Producing Such Cladding | Dec 26, 2022 | Pending |
| 18/717,412 | Dec 5, 2022 | Pending | |
| 18/705,363 | Computer Implemented Method for Simulating an Operation of a Reactor Core | Oct 25, 2022 | Pending |
| 18/700,269 | Plate-Shaped Nuclear Fuel Element and Method of Manufacturing the Same | Oct 17, 2022 | Pending |
| 18/699,706 | Ultrasound probe for inspection of a component at a temperature above 150°C and associated inspection method | Oct 10, 2022 | Pending |
| 18/692,733 | Method for Producing a Granulated Metal Oxide Powder and Corresponding Granulated Metal Oxide Powder | Sep 15, 2022 | Pending |
| 18/689,854 | Method and System for Monitoring a Nuclear Plant, with Detection and Characterization of an Imbalance | Sep 7, 2022 | Pending |
| 17/870,784 | Jul 21, 2022 | Pending | |
| 18/577,191 | Method for Manufacturing a Nuclear Fuel Element and Nuclear Fuel Element | Jul 6, 2022 | Pending |
10 of 22 applications shown.
Pro members see all 22 published applications.