GE-Hitachi Nuclear Energy Americas LLC
49 maintenance fees come due in the 12 months from Nov 24, 2026, the next on Dec 4, 2026. Unpaid by Jun 4, 2027, that one lapses early.
A maintenance fee does not end a patent on its due date. It falls due at 3.5, 7.5
and 11.5 years from grant, and the patent lapses only if the fee is still unpaid at the end of the
six month grace period that follows.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Holder | Status | Fee due | Lapses if unpaid | Expires | Confidence |
|---|---|---|---|---|---|---|---|
| US 10,311,985 | Fault Tolerant Turbine Speed Control System In force Fee due Dec 4, 2026 Lapses if unpaid Jun 4, 2027 · High confidence | GE-Hitachi Nuclear Energy Americas LLC | In force | Dec 4, 2026 | Jun 4, 2027 | High confidence | |
| US 10,311,986 | Inspection Apparatus and Method of Inspecting a Reactor Component Using the Same In force Fee due Dec 4, 2026 Lapses if unpaid Jun 4, 2027 · High confidence | GE-Hitachi Nuclear Energy Americas LLC | In force | Dec 4, 2026 | Jun 4, 2027 | High confidence | |
| US 9,053,823 | Method and Apparatus for an Alternative Suppression Pool Cooling for Boiling Water Reactors In force Fee due Dec 9, 2026 Lapses if unpaid Jun 9, 2027 · High confidence | GE-Hitachi Nuclear Energy Americas LLC | In force | Dec 9, 2026 | Jun 9, 2027 | High confidence | |
| US 9,064,609 | Mechanical Connections and Methods In force Fee due Dec 23, 2026 Lapses if unpaid Jun 23, 2027 · High confidence | GE-Hitachi Nuclear Energy Americas LLC | In force | Dec 23, 2026 | Jun 23, 2027 | High confidence | |
| US 10,340,048 | Passive Safety System for Removing Decay Heat and Method of Passively Increasing a Coolant Flow Using the Same In force Fee due Jan 2, 2027 Lapses if unpaid Jul 2, 2027 · High confidence | GE-Hitachi Nuclear Energy Americas LLC | In force | Jan 2, 2027 | Jul 2, 2027 | High confidence | |
| US 9,074,922 | Systems and Methods for Remotely Measuring a Liquid Level Using Time-Domain Reflectometry (TDR) In force (reinstated) Fee due Jan 7, 2027 Lapses if unpaid Jul 7, 2027 · High confidence | GE-Hitachi Nuclear Energy Americas LLC | In force (reinstated) | Jan 7, 2027 | Jul 7, 2027 | High confidence | |
| US 10,354,763 | Piping Enhancement for Backflow Prevention in a Multiple Loop, Metal Cooled Nuclear Reactor System In force Fee due Jan 16, 2027 Lapses if unpaid Jul 16, 2027 · High confidence | GE-Hitachi Nuclear Energy Americas LLC | In force | Jan 16, 2027 | Jul 16, 2027 | High confidence | |
| US 11,717,865 | Method of Cleaning a Nozzle of a Jet Pump Assembly of a Nuclear Reactor In force Fee due Feb 8, 2027 Lapses if unpaid Aug 9, 2027 · High confidence | GE-Hitachi Nuclear Energy Americas LLC | In force | Feb 8, 2027 | Aug 9, 2027 | High confidence | |
| US 11,721,443 | Stationary Isolated Rod Couplings for Use in a Nuclear Reactor Control Rod Drive In force Fee due Feb 8, 2027 Lapses if unpaid Aug 9, 2027 · High confidence | GE-Hitachi Nuclear Energy Americas LLC | In force | Feb 8, 2027 | Aug 9, 2027 | High confidence | |
| US 11,728,050 | Methods of Moving an Induction Coil to Move a Control Element in a Nuclear Reactor In force Fee due Feb 15, 2027 Lapses if unpaid Aug 16, 2027 · High confidence | GE-Hitachi Nuclear Energy Americas LLC | In force | Feb 15, 2027 | Aug 16, 2027 | High confidence | |
| 39 more maintenance fees coming due in the 12 months from Nov 24, 2026 · Pro | |||||||
10 of 49 patents shown. Soonest fee due date first, then patent number.
Pro members see every patent with a maintenance fee coming due: number, title, status, the due date, and the date it lapses if the fee goes unpaid through the grace period.
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.