Recorded as renamed to GE Aerospace Poland (2026)
35 patents currently held
32 more in force are now held by other companies
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
The next US patent term in the General Electric Company Polska SP. Z O.O. portfolio ends in Aug 2038, and more of its terms end in 2041 (11) than in any other year. from the record
Of the 32 now held by other companies, 18 name General Electric Company as their current owner, and 14 more name another party. Each row says which.
Free plan: 3 watched companies. Pro: unlimited.
Alerts on its grants, lapses and transfers.
0
Ending by 2030
Aug 2038
Next term end
28
Patent families
When these terms end
Held patents by the year their term ends
notable patents
fee due within 90 days
all others
Updated Nov 25, 2026 · includes USPTO assignment data published Nov 24, 2026, status data published Nov 25, 2026 and grant & fee data published Nov 24, 2026 (weekly) · how we know
Notable: the highest-ranked patents in this portfolio by citations and family size. Fee due within 90 days: a maintenance fee is due within 90 days of when this page was computed and not yet paid.
Notable patents
Ranked by citations and family size, against patents of the same kind granted the same year. How we rank
Notable
Ends Sep 2041 · High confidence
Also notable
Ends Aug 2041 · High confidence
Also notable
Ends Jul 2041 · High confidence
Also notable
Ends Sep 2039 · High confidence
Also notable
Ends Oct 2041 · High confidence
Also notable
Ends Dec 2041 · High confidence
Also notable
Ends Apr 2039 · High confidence
Also notable
Ends Aug 2038 · High confidence
Bearing Current Mitigation for an Electric Machine Embedded in a Gas Turbine Engine
US 11,735,982
Cited by 5 later US patents, top 25% of utility patents granted in 2023 in our data. Protection runs to 2041.
Connection Structure for a Generator Assembly
US 11,746,671
Cited by 3 later US patents, top 25% of utility patents granted in 2023 in our data. Protection runs to 2041.
Engine Airfoil Metal Edge
US 11,725,524
Cited by 4 later US patents, top 25% of utility patents granted in 2023 in our data. Protection runs to 2041.
Air Delivery System for a Gas Turbine Engine
US 11,499,479
The most cited patent in this portfolio, cited by 24 later US patents, top 5% of utility patents granted in 2022 in our data. Protection runs to 2039.
Turbomachine and System for Compressor Operation
US 11,814,988
Cited by 8 later US patents, top 10% of utility patents granted in 2023 in our data. Protection runs to 2041.
Gas Turbine Engine with Clearance Control System
US 11,788,425
Cited by 6 later US patents, top 25% of utility patents granted in 2023 in our data. Protection runs to 2041.
Inlet Screen for Aircraft Engines
US 11,084,599
Cited by 8 later US patents, top 25% of utility patents granted in 2021 in our data. Protection runs to 2039.
Turbine Nozzle Having an Angled Inner Band Flange
US 11,333,041
Granted 2022. Computed term ends 2038.
Fee deadlines
Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
- 3 fees due Feb 8 to 22, 2027 · next Feb 8
- 1 fee due Mar 5, 2027The maintenance fee for Connection Structure for a Generator Assembly (US 11,746,671) comes due Mar 5, 2027. Unpaid by Sep 7, 2027, it lapses early.
- 1 fee due Apr 17, 2027The maintenance fee for Gas Turbine Engine with Clearance Control System (US 11,788,425) comes due Apr 17, 2027. Unpaid by Oct 18, 2027, it lapses early.
- 1 fee due May 14, 2027The maintenance fee for Turbomachine and System for Compressor Operation (US 11,814,988) comes due May 14, 2027. Unpaid by Nov 15, 2027, it lapses early.
- 1 fee due Jun 19, 2027The maintenance fee for Turbine Engine Assembly (US 11,846,193) comes due Jun 19, 2027. Unpaid by Dec 20, 2027, it lapses early.
- 2 fees due Jul 2 to 30, 2027 · next Jul 2
Recent changes
- 3 of the patents on this record were granted since Aug 27, 2026
What they patent
The largest of its 28 families, grouped by real patent family and labeled by the earliest filing in each. No technology classification is inferred from titles.
| Connection Structure for a Generator Assembly | 3 in force | to Aug 2041 |
| Rotor Assembly for a Gas Turbine Engine | 2 in force | to Dec 2042 |
| Gas Turbine Engine with a Fluid Conduit System and a Method of Operating the Same | 2 in force | to Jan 2042 |
| Bearing Current Mitigation for an Electric Machine Embedded in a Gas Turbine Engine | 2 in force | to Nov 2041 |
| Engine Airfoil Metal Edge | 2 in force | to Jul 2041 |
| Turbine Nozzle Having an Angled Inner Band Flange | 2 in force | to Oct 2038 |
| Gas Turbine Engines with Inlet Guide Vanes | 1 in force | to Dec 2044 |
| Methods and Apparatus to Improve Fan Operability Control Using Smart Materials | 1 in force | to Jul 2043 |
| Reverse Flow Gas Turbine Engine Having Electric Machine | 1 in force | to Apr 2043 |
| Propulsion Engine Assemblies Providing Access to Components Within Propulsor Cavities | 1 in force | to Jan 2042 |
Patents held now
Soonest term end first.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 11,333,041 | Turbine Nozzle Having an Angled Inner Band Flange In force · High confidence | In force | High confidence | |
| US 10,830,100 | Turbine Nozzle Having an Angled Inner Band Flange In force · High confidence | In force | High confidence | |
| US 10,801,365 | Turbine Engine and Components for Use Therein In force · High confidence | In force | High confidence | |
| US 11,084,599 | Inlet Screen for Aircraft Engines In force · High confidence | In force | High confidence | |
| US 11,499,479 | Air Delivery System for a Gas Turbine Engine In force · High confidence | In force | High confidence | |
| US 11,846,193 | Turbine Engine Assembly In force · High confidence | In force | High confidence | |
| US 11,454,463 | Fluid Eductors, and Systems and Methods of Entraining Fluid Using Fluid Eductors In force · High confidence | In force | High confidence | |
| US 11,346,248 | Turbine Nozzle Segment and a Turbinne Nozzle Comprising Such a Turbine Nozzle Segment In force · High confidence | In force | High confidence | |
| US 11,885,240 | Gas Turbine Engine with Fluid Circuit and Ejector In force · High confidence | In force | High confidence | |
| US 11,725,524 | Engine Airfoil Metal Edge In force · High confidence | In force | High confidence |
Also on record, not counted in the 35: 32 patents in force now held by others · 20 applications pending · 6 applications abandoned. List them
Sources and methods
Compiled from USPTO application file histories, grants and recorded assignments, with the company's own names reviewed by hand. How this record was built
Portfolio grouped automatically from ownership conveyances to the names matched to this company, usually every name that begins with its own, so it counts patents an affiliate holds; each list row names the holder of record. Security interests are excluded and ambiguous records are not reviewed by hand.
Fee due within 90 days marks a patent with a maintenance fee due within 90 days of the date this page was computed and not yet recorded paid, so it can end earlier than the bar shows. A fee left unpaid ends the patent at the close of the six month grace period that follows its due date, not on the due date itself. It is not a prediction that the fee will be missed.
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.