Geolog S.R.L.
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
0
Ending by 2030
Oct 2031
Next term end
When these terms end
Held patents by the year their term ends
20262027202820292030203120322033203420352036203720382039204020412042204320442045
Fee deadlines
Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
- 1 fee due Mar 17, 2027The maintenance fee for Method and relative system for the detection and quantification of the H2S in drilling mud (US 10,416,141) comes due Mar 17, 2027. Unpaid by Sep 17, 2027, it lapses early.
- 1 fee due May 14, 2027The maintenance fee for Method for installing a geothermal system, method for utilizing geothermal energy, and geothermal system (US 11,815,293) comes due May 14, 2027. Unpaid by Nov 15, 2027, it lapses early.
Recent changes
- 2 of the patents on this record were granted since Aug 23, 2026
- Oct 6 US 12,754,153 Method and System for Determining Physical Properties of Rocky Formations
- Sep 15 US 12,736,517 Geological Sample Interpretation Through Systematic Analysis of Colour, Elemental Data and Electromagnetic Observation
Patents held now
Soonest term end first. Each date below is computed on that patent's own page, which shows the rule, the adjustments and the fee history it was derived from.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 8,556,001 | Process for determining the presence and/or quantity of H2S in subsoil and related apparatus In force · USPTO record | In force | USPTO record | |
| US 8,499,614 | Field gas chromatograph with flame ionization In force · USPTO record | In force | USPTO record | |
| US 10,145,835 | Site analysis system for the calculation of the isotope ratio of the carbon in several gas species by means of a single analyser In force · USPTO record | In force | USPTO record | |
| US 9,557,305 | Device for measuring total or fractionated quantity of hydrocarbons in a solid sample In force · USPTO record | In force | USPTO record | |
| US 10,167,676 | Method and relative system for the identification of malfunctionings of the drill bit during the drilling of hydrocarbon wells In force · USPTO record | In force | USPTO record | |
| US 10,416,141 | Method and relative system for the detection and quantification of the H2S in drilling mud In force · USPTO record | In force | USPTO record | |
| US 10,962,464 | Method for determining an extraction efficiency of at least one volatile species contained in a drilling mud In force · USPTO record | In force | USPTO record | |
| US 11,441,989 | Method and apparatus for carrying out rheologic measurements of a drilling mud In force · USPTO record | In force | USPTO record | |
| US 11,268,372 | Method and apparatus for determining the permeability of a fracture in a hydrocarbon reservoir In force · USPTO record | In force | USPTO record | |
| US 11,512,543 | Method for quantifying the volumetric flow rate of a flow of a drilling mud in a floating structure for subsoil drilling In force · USPTO record | In force | USPTO record |
Also on record, not counted in the 16: 4 lapsed for an unpaid fee · 1 ended at full term. List them
Sources and methods
Compiled from the USPTO record, grants, published applications and recorded assignments, not yet reviewed by hand.
How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
Published applications
US patent applications published under this name that have not become patents. An application is published about eighteen months after its earliest filing; one that has not been published is in no public record.
3 no status recorded