Every in-force patent on Hohai University's record whose computed term ends in 2044, whoever holds it now. Soonest term end first, then patent number.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Holder | Status | Expires | Confidence |
|---|---|---|---|---|---|
| US 12,493,752 | Automatic concrete dam defect image description generation method based on graph attention network In force · High confidence | Huaneng Lancang River Hydropower Inc., Hohai University and Huaneng Group R&D Center Co., Ltd. | In force | High confidence | |
| US 12,644,189 | Anti-Cavitation Damping Composite Metal Structure for Flow Passage Component In force · High confidence | Hohai University | In force | High confidence | |
| US 12,561,572 | Method for Calibrating Parameters of Hydrology Forecasting Model Based on Deep Reinforcement Learning In force · High confidence | Hohai University | In force | High confidence | |
| US 12,548,295 | Quick and Intelligent IR7-EC Network Based Classification Method for Concrete Image Crack Type In force · High confidence | Hohai University, Jsti Group and Jiangsu Dongjiao Intelligent Control Technology Group Co., Ltd. | In force | High confidence | |
| US 12,498,291 | Damage Identification Method for Cantilever Beam Based on Multifractal Spectrum of Multi-Scale Reconstructed Attractor In force · High confidence | Hohai University, Jiangxi University of Science and Technology and Jsti Group | In force | High confidence | |
| US 12,536,775 | Time-series image description method for dam defects based on local self-attention In force · High confidence | Huaneng Lancang River Hydropower Inc. and Hohai University | In force | High confidence | |
| US 12,385,823 | Evaluation Method for Corrosion Damage Evolution of Underwater Concrete Structures Hohai University, Jiangxi University of Science and Technology and Jiangsu Dongjiao Intelligent Control Technology Group Co., Ltd. In force · High confidence | Hohai University, Jiangxi University of Science and Technology and Jiangsu Dongjiao Intelligent Control Technology Group Co., Ltd. | In force | High confidence | |
| US 12,299,353 | Doa-Based Pumping Station-Lid Joint Multi-Objective Optimization Method Hohai University, Nanjing Lishuiqu Water Authority and Jiangsu Yuzhi River Basin Management Technology Research Institute Co. Ltd. In force · High confidence | Hohai University, Nanjing Lishuiqu Water Authority and Jiangsu Yuzhi River Basin Management Technology Research Institute Co. Ltd. | In force | High confidence | |
| US 12,687,832 | Optimal Scheduling Method for Peak Regulation of Cascade Hydro-Photovoltaic Complementary Power Generation System Huaneng Lancang River Hydropower Inc., Hohai University, Powerchina Guiyang Engineering Corporation Limited and Huaneng Group R&D Center Co., Ltd. In force · High confidence | Huaneng Lancang River Hydropower Inc., Hohai University, Powerchina Guiyang Engineering Corporation Limited and Huaneng Group R&D Center Co., Ltd. | In force | High confidence | |
| US 12,676,486 | Hydro-Photovoltaic Complementary Operation Chart Application Method for Clean Energy Base Huaneng Lancang River Hydropower Inc., Powerchina Guiyang Engineering Corporation Limited, Hohai University and Huaneng Group R&D Center Co., Ltd. In force · High confidence | Huaneng Lancang River Hydropower Inc., Powerchina Guiyang Engineering Corporation Limited, Hohai University and Huaneng Group R&D Center Co., Ltd. | In force | High confidence | |
| 4 more term ends in 2044 · Pro | |||||
10 of 14 patents shown. Soonest term end first, then patent number.
Pro members see all 14.
13 of these are in force and held by Hohai University.
Updated Nov 24, 2026 · includes USPTO assignment data published Nov 23, 2026, status data published Nov 24, 2026 and grant & fee data published Nov 24, 2026 (weekly) · how we know
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.