Joint Stock Company "Akme-Engineering"
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
0
Ending by 2030
Dec 2033
Next term end
When these terms end
Held patents by the year their term ends
20262027202820292030203120322033203420352036203720382039204020412042204320442045
Fee deadlines
Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
- 1 fee due Feb 13, 2027The maintenance fee for Nuclear fuel pellet having enhanced thermal conductivity, and preparation method thereof (US 10,381,119) comes due Feb 13, 2027. Unpaid by Aug 13, 2027, it lapses early.
- 1 fee due Mar 24, 2027The maintenance fee for Method and control system for gas injection into coolant and nuclear reactor plant (US 10,424,413) comes due Mar 24, 2027. Unpaid by Sep 24, 2027, it lapses early.
- 1 fee due Jul 28, 2027The maintenance fee for Molten metal transfer pump (US 10,544,792) comes due Jul 28, 2027. Unpaid by Jan 28, 2028, it lapses early.
- 2 fees due Aug 18 to 25, 2027 · next Aug 18
- 1 fee due Oct 28, 2027The maintenance fee for Secondary startup neutron source (US 10,636,537) comes due Oct 28, 2027. Unpaid by Apr 28, 2028, it lapses early.
Recent changes
Nothing was recorded against this company's patents in the last 90 days.
Patents held now
Soonest term end first. Each date below is computed on that patent's own page, which shows the rule, the adjustments and the fee history it was derived from.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 9,947,421 | Nuclear reactor with liquid metal coolant In force · USPTO record | In force | USPTO record | |
| US 9,694,335 | Mass transfer apparatus In force · USPTO record | In force | USPTO record | |
| US 10,573,417 | Method for guaranteeing fast reactor core subcriticality under conditions of uncertainty regarding the neutron-physical characteristics thereof In force · USPTO record | In force | USPTO record | |
| US 10,720,244 | Fuel rod cladding, fuel rod and fuel assembly In force · USPTO record | In force | USPTO record | |
| US 10,204,711 | Control rod drive includes an electric drive and a toothed rack In force · USPTO record | In force | USPTO record | |
| US 10,290,382 | Method for preparing to reload a nuclear reactor In force · USPTO record | In force | USPTO record | |
| US 10,381,119 | Nuclear fuel pellet having enhanced thermal conductivity, and preparation method thereof In force · USPTO record | In force | USPTO record | |
| US 10,204,712 | Method for inner-contour passivation of steel surfaces of nuclear reactor In force · USPTO record | In force | USPTO record | |
| US 10,636,537 | Secondary startup neutron source In force · USPTO record | In force | USPTO record | |
| US 10,563,929 | Heat exchanger tube spacing device (varinats) In force · USPTO record | In force | USPTO record |
Also on record, not counted in the 14: 3 lapsed for an unpaid fee. List them
Sources and methods
Compiled from the USPTO record, grants, published applications and recorded assignments, not yet reviewed by hand.
How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
Published applications
US patent applications published under this name that have not become patents. An application is published about eighteen months after its earliest filing; one that has not been published is in no public record.
1 abandoned · 7 no status recorded