The Patent Finder

Mighty Fire Breaker LLC

41 patents currently held · Updated Nov 24, 2026
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.

Recorded under 3 name spellings.

0
Ending by 2030
Dec 2037
Next term end

When these terms end

Held patents by the year their term ends
20262027202820292030203120322033203420352036203720382039204020412042204320442045

Fee deadlines

Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
  • 1 fee due Dec 25, 2026
    The maintenance fee for Just-In-Time Factory Methods, System and Network for Prefabricating Class-A Fire-Protected Wood-Framed Buildings and Components Used to Construct the Same (US 10,332,222) comes due Dec 25, 2026. Unpaid by Jun 25, 2027, it lapses early.
  • 4 fees due Jan 11 to 25, 2027 · next Jan 11
  • 1 fee due Feb 22, 2027
    The maintenance fee for GPS Tracking and Mapping Wildfire Defense System Network for Proactively Defending Homes and Neighborhoods Against Threat of Wild Fire by Spraying Environmentally-Safe Anti-Fire Chemical Liquid on Property Surfaces to Inhibit Fire Ignition and Flame Spread in the Presence of Wild Fire (US 11,730,987) comes due Feb 22, 2027. Unpaid by Aug 23, 2027, it lapses early.
  • 2 fees due Apr 1 to 24, 2027 · next Apr 1
  • 1 fee due May 28, 2027
    The maintenance fee for Process of Forming Strategic Chemical-Type Wildfire Breaks on Ground Surfaces to Proactively Prevent Fire Ignition and Flame Spread, and Reduce the Production of Smoke in the Presence of a Wild Fire (US 11,826,592) comes due May 28, 2027. Unpaid by Nov 29, 2027, it lapses early.
  • 1 fee due Jun 5, 2027
    The maintenance fee for System, Network and Methods for Estimating and Recording Quantities of Carbon Securely Stored in Class-A Fire-Protected Wood-Framed and Mass-Timber Buildings on Construction Job-Sites, and Class-A Fire-Protected Wood-Framed and Mass Timber Components in Factory Environments (US 11,836,807) comes due Jun 5, 2027. Unpaid by Dec 6, 2027, it lapses early.
  • 2 fees due Jul 9, 2027
  • 1 fee due Aug 27, 2027
    The maintenance fee for Environmentally-Clean Fire Inhibiting and Extinguishing Compositions and Products for Sorbing Flammable Liquids While Inhibiting Ignition and Extinguishing Fire (US 11,911,643) comes due Aug 27, 2027. Unpaid by Feb 28, 2028, it lapses early.
  • 1 fee due Nov 19, 2027
    The maintenance fee for Methods of Suppressing Wild Fires Raging Across Regions of Land in the Direction of Prevailing Winds by Forming Anti-Fire (AF) Chemical Fire-Breaking Systems Using Environmentally Clean Anti-Fire (AF) Liquid Spray Applied Using GPS-Tracking Techniques (US 10,653,904) comes due Nov 19, 2027. Unpaid by May 19, 2028, it lapses early.

Which patents, and when each one lapses · Pro

Recent changes

Nothing was recorded against this company's patents in the last 90 days.

Patents held now

Soonest term end first. Each date below is computed on that patent's own page, which shows the rule, the adjustments and the fee history it was derived from.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
PatentTitleStatus Expires Confidence
US 10,290,004Supply Chain Management System for Supplying Clean Fire Inhibiting Chemical (CFIC) Totes to a Network of Wood-Treating Lumber and Prefabrication Panel Factories and Wood-Framed Building Construction Job Sites
In force (reinstated)
 · High confidence
In force (reinstated)High confidence
US 10,332,222Just-In-Time Factory Methods, System and Network for Prefabricating Class-A Fire-Protected Wood-Framed Buildings and Components Used to Construct the Same
In force (reinstated)
 · High confidence
In force (reinstated)High confidence
US 10,430,757Mass Timber Building Factory System for Producing Prefabricated Class-A Fire-Protected Mass Timber Building Components for Use in Constructing Prefabricated Class-A Fire-Protected Mass Timber Buildings
In force (reinstated)
 · High confidence
In force (reinstated)High confidence
US 10,653,904Methods of Suppressing Wild Fires Raging Across Regions of Land in the Direction of Prevailing Winds by Forming Anti-Fire (AF) Chemical Fire-Breaking Systems Using Environmentally Clean Anti-Fire (AF) Liquid Spray Applied Using GPS-Tracking Techniques
In force (reinstated)
 · High confidence
In force (reinstated)High confidence
US 10,695,597Method of and Apparatus for Applying Fire and Smoke Inhibiting Compositions on Ground Surfaces Before the Incidence of Wild-Fires, and Also Thereafter, Upon Smoldering Ambers and Ashes to Reduce Smoke and Suppress Fire Re-Ignition
In force (reinstated)
 · High confidence
In force (reinstated)High confidence
US 11,400,324Method of Protecting Life, Property, Homes and Businesses from Wild Fire by Proactively Applying Environmentally-Clean Anti-Fire (AF) Chemical Liquid Spray in Advance of Wild Fire Arrival and Managed Using a Wireless Network with GPS-Tracking
In force
 · High confidence
In forceHigh confidence
US 11,633,636Wireless Neighborhood Wildfire Defense System Network Supporting Proactive Protection of Life and Property in a Neighborhood Through GPS-Tracking and Mapping of Environmentally-Clean Anti-Fire (AF) Chemical Liquid Spray Applied to the Property Before Wild Fires Reach the Neighborhood
In force
 · Low confidence
In forceLow confidence
US 11,638,844Method of Proactively Protecting Property from Wild Fire by Spraying Environmentally-Clean Anti-Fire Chemical Liquid on Property Surfaces Prior to Wild Fire Arrival Using Remote Sensing and GPS-Tracking and Mapping Enabled Spraying
In force
 · Low confidence
In forceLow confidence
US 11,642,555Wireless Wildfire Defense System Network for Proactively Defending Homes and Neighborhoods Against Wild Fires by Spraying Environmentally-Clean Anti-Fire Chemical Liquid on Property and Buildings and Forming GPS-Tracked and Mapped Chemical Fire Breaks About the Property
In force
 · High confidence
In forceHigh confidence
US 11,654,313Wireless Communication Network, GPS-Tracked Ground-Based Spraying Tanker Vehicles and Command Center Configured for Proactively Spraying Environmentally-Safe Anti-Fire Chemical Liquid on Property Surfaces to Inhibit Fire Ignition and Flame Spread in the Presence of Wild Fire
In force
 · Low confidence
In forceLow confidence
10 of 41 patents shown.
Pro members see all 41.
Pro members: see all 41 patents
Also on record, not counted in the 41: 1 lapsed for an unpaid fee. List them

Sources and methods

Compiled from the USPTO record, grants, published applications and recorded assignments, not yet reviewed by hand. How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.

Published applications

US patent applications published under this name that have not become patents. An application is published about eighteen months after its earliest filing; one that has not been published is in no public record.

28 pending · 1 abandoned · 1 no status recorded

Showing 1 to 10 of 30, newest filing first. An application has no patent term. A term is computed when and if it grants, and appears on that patent's own page.

ApplicationTitleFiledStatus
19/081,147Ground-Based Vehicle for Making and Hydraulically Spraying a Fireand Smoke Inhibiting Slurry Composition Over a Burning Fire on a Combustible Surface in Order to Suppress the Burning FireMar 17, 2025Pending
18/964,428Environmentally-Safe Water-Based Fire Retardant Biochemical Compositions Formulated Using Alkali Metal Salts, Free from Phosphates, Nitrates, and Ammonium-Salts, for Non-Corrosive Aerial and Ground Delivery onto Property Requiring Long-Term Protection Against WildfireNov 30, 2024Pending
18/814,508Environmentally-Safe Water-Based Fire Retardant Biochemical Compositions Formulated Using Alkali Metal Salts, Free from Phosphates, Nitrates, and Ammonium-Salts, for Non-Corrosive Aerial and Ground Delivery onto Property Requiring Long-Term Protection Against WildfireAug 24, 2024Pending
18/788,292Method of Installing and Commissioning the Operation of an Automated Home Sprinkler-Based Wildfire Defense System During the Post-Construction Phase of a Completed Home Building ProjectJul 30, 2024Abandoned
18/788,278Wireless System Network for Managing a Fleet of Wildfire Defense System Trailers Deployed on a Wood-Building Construction Job-Sites Located in a Wildfire Urban Interface (WUI) Region to Reduce the Risk of Construction Project Damage, Destruction and Loss Due to WildireJul 30, 2024Pending
18/788,268Trailer-Based Wildfire Defense Spraying System for Automatically Spraying a Wood-Building Construction Job-Site with Environmentally-Clean Liquid Fire Inhibitor Before Arrival of Wildfire Remotely-Detected in a Wildfire Urban Interface (WUI) RegionJul 30, 2024Pending
18/788,249Mobile Wildfire Defense System Trailer for Deployment and Use on a Wood-Building Job-Site from Wildfire During the Construction Phase of a Wood-Building Construction Project Located Within a Wildfire Urban Interface (WUI) RegionJul 30, 2024Pending
18/788,241Wildfire Defense System Trailer for Protecting a Wood-Building Job-Site from Wildfire During the Construction Phase of a Wood-Building Construction Project Located Within a Wildfire Urban Interface (WUI) RegionJul 30, 2024Pending
18/751,314Environmentally-Clean Water-Based Fire Inhibiting Biochemical Solutions Formulated Using Alkali Metal Salts of Benzoic Acid for Protecting Property Against WildfireJun 23, 2024Pending
18/751,313Environmentally-Clean Water-Based Fire Inhibiting Biochemical Solutions Formulated Using Alkali Metal Salts of Gluconic Acid for Protecting Property Against WildfireJun 23, 2024Pending
10 of 30 applications shown.
Pro members see all 30 published applications.
Pro members: see all 30 applications
The Patent Finder CompaniesExpirationsCalculatorWatchlistPricing MethodologyCorrectionsLegalPrivacysupport@thepatentfinder.com Updated Nov 24, 2026 · includes USPTO assignment data published Nov 23, 2026, status data published Nov 24, 2026 and grant & fee data published Nov 24, 2026 (weekly) Part of 137 Finder · © 2026 137 Finder LLC · Sources cited