The Patent Finder

Nordex Energy Spain, S.A.U.

22 patents currently held · Updated Nov 25, 2026
4 more in force are now held by other companies
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
0
Ending by 2030
Jul 2038
Next term end

When these terms end

Held patents by the year their term ends
20262027202820292030203120322033203420352036203720382039204020412042204320442045

Fee deadlines

Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
  • 1 fee due Mar 26, 2027
    The maintenance fee for Wind turbine blade (US 11,767,818) comes due Mar 26, 2027. Unpaid by Sep 27, 2027, it lapses early.
  • 1 fee due May 21, 2027
    The maintenance fee for Method for assembling a wind turbine and wind turbine assembled according to said method (US 11,821,403) comes due May 21, 2027. Unpaid by Nov 22, 2027, it lapses early.
  • 1 fee due Sep 19, 2027
    The maintenance fee for Method and device to extend the life cycle of a wind turbine (US 11,933,268) comes due Sep 19, 2027. Unpaid by Mar 20, 2028, it lapses early.
  • 1 fee due Nov 5, 2027
    The maintenance fee for Pre-assembly slab system for concrete wind turbine towers and method for assembling a pre-assembly slab system for concrete wind turbine towers (US 10,641,247) comes due Nov 5, 2027. Unpaid by May 5, 2028, it lapses early.

Which patents, and when each one lapses · Pro

Recent changes

  • 1 of the patents on this record was granted since Aug 27, 2026

Patents held now

Soonest term end first. Each date below is computed on that patent's own page, which shows the rule, the adjustments and the fee history it was derived from.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
PatentTitleStatus Expires Confidence
US 10,641,247Pre-assembly slab system for concrete wind turbine towers and method for assembling a pre-assembly slab system for concrete wind turbine towers
In force
 · USPTO record
In forceUSPTO record
US 10,935,000Tool for Transporting a Wind Turbine Power Train Subset
In force
 · High confidence
In forceHigh confidence
US 10,895,089Wind turbine tower with reinforcing elements
In force
 · USPTO record
In forceUSPTO record
US 10,954,918Method for operating electrical machines
In force
 · USPTO record
In forceUSPTO record
US 11,434,873Method for operating electrical machines
In force
 · USPTO record
In forceUSPTO record
US 11,359,609Anchor cage for a foundation of a wind turbine, assembly method thereof and foundation of a wind turbine
In force
 · USPTO record
In forceUSPTO record
US 11,933,268Method and device to extend the life cycle of a wind turbine
In force
 · USPTO record
In forceUSPTO record
US 11,326,578Wind farm control system and associated method
In force
 · USPTO record
In forceUSPTO record
US 11,448,185Control system of a wind turbine and associated method
In force
 · USPTO record
In forceUSPTO record
US 11,821,403Method for assembling a wind turbine and wind turbine assembled according to said method
In force
 · USPTO record
In forceUSPTO record
10 of 22 patents shown.
Pro members see all 22.
Pro members: see all 22 patents
Also on record, not counted in the 22: 4 patents in force now held by others. List them

Sources and methods

Compiled from the USPTO record, grants, published applications and recorded assignments, not yet reviewed by hand. How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.

Published applications

US patent applications published under this name that have not become patents. An application is published about eighteen months after its earliest filing; one that has not been published is in no public record.

4 pending

Showing 1 to 4 of 4, newest filing first. An application has no patent term. A term is computed when and if it grants, and appears on that patent's own page.

ApplicationTitleFiledStatus
19/040,665Method for Identifying a Defect in an Electrical Component of an Energy Installation, Generator Unit, Energy Installation, Computer-Implemented Method and Computer Program ProductJan 29, 2025Pending
18/908,416Wind Turbine Rotor Blade Spacer, Transportation and Storage System for Wind Turbine Rotor Blades and Related MethodOct 7, 2024Pending
18/750,651Concrete Segment of a Section of a Wind Turbine Tower, Set of a Concrete Segment and Heating Means, Concrete Section, Wind Turbine, Mould and Method of Assembling the Wind TurbineJun 21, 2024Pending
18/724,924Support Element For A Segment Of Wind Turbine Towers, Support System Comprising At Least A Support Element And Method Of Supporting At Least A Segment Of Wind Turbine TowersDec 1, 2022Pending
The Patent Finder CompaniesExpirationsCalculatorWatchlistPricing MethodologyCorrectionsLegalPrivacysupport@thepatentfinder.com Updated Nov 25, 2026 · includes USPTO assignment data published Nov 24, 2026, status data published Nov 25, 2026 and grant & fee data published Nov 24, 2026 (weekly) Part of 137 Finder · © 2026 137 Finder LLC · Sources cited