Nordex Energy Spain, S.A.
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
Previously recorded as Acciona Windpower, S.A. (to 2020)
11
Ending by 2030
Jul 2027
Next term end
When these terms end
Held patents by the year their term ends
20262027202820292030203120322033203420352036203720382039204020412042204320442045
Fee deadlines
Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
- 1 fee due Dec 25, 2026The maintenance fee for Wind turbine control method and associated wind turbine (US 10,330,080) comes due Dec 25, 2026. Unpaid by Jun 25, 2027, it lapses early.
- 1 fee due Jun 10, 2027The maintenance fee for Blade for a wind turbine (US 10,502,180) comes due Jun 10, 2027. Unpaid by Dec 10, 2027, it lapses early.
- 1 fee due Jul 19, 2027The maintenance fee for Wind turbine assembly system (US 9,238,923) comes due Jul 19, 2027. Unpaid by Jan 19, 2028, it lapses early.
- 1 fee due Aug 9, 2027The maintenance fee for Power generation plant voltage control (US 9,257,845) comes due Aug 9, 2027. Unpaid by Feb 9, 2028, it lapses early.
Recent changes
- 1 of the patents on this record was granted since Aug 25, 2026
- Nov 10 US 12,791,012 Wind Turbine
Patents held now
Soonest term end first. Each date below is computed on that patent's own page, which shows the rule, the adjustments and the fee history it was derived from.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 7,602,075 | Systems, methods and apparatuses for a wind turbine controller In force · USPTO record | In force | USPTO record | |
| US 8,381,487 | Assembly structure and procedure for concrete towers used in wind turbines In force · USPTO record | In force | USPTO record | |
| US 8,520,417 | DC voltage regulator In force · USPTO record | In force | USPTO record | |
| US 7,765,766 | Assembly structure and procedure for concrete towers used in wind turbines In force · USPTO record | In force | USPTO record | |
| US 8,355,825 | Wind farm In force · USPTO record | In force | USPTO record | |
| US 8,505,244 | Modular tower structure for eolic turbines and other applications In force · USPTO record | In force | USPTO record | |
| US 8,696,246 | Supporting element for an offshore wind turbine, production method thereof and method for installing same In force · USPTO record | In force | USPTO record | |
| US 8,035,240 | Systems and methods for synchronous speed avoidance in doubly-fed induction generators In force · USPTO record | In force | USPTO record | |
| US 8,659,178 | Wind turbine control method, control unit and wind turbine In force · USPTO record | In force | USPTO record | |
| US 8,826,614 | System for joining a gondola to the concrete tower of an aerogenerator In force · USPTO record | In force | USPTO record |
Also on record, not counted in the 54: 3 lapsed for an unpaid fee. List them
Sources and methods
Compiled from the USPTO record, grants, published applications and recorded assignments, not yet reviewed by hand.
How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
Published applications
Every application published under this name has become a patent.