Records under this name other than the patents North China Electric Power University holds now: patents now held by others, patents whose terms have ended, and its applications, pending or abandoned. None of them is counted in the 96 patents it holds.
Back to North China Electric Power University
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 11,401,913 | Yaw Calibration Method and System for Wind Turbine Lapsed on the fee record Ended Aug 2, 2026 · High confidence | Lapsed on the fee record | Ended Aug 2, 2026 | High confidence |
| US 11,306,245 | Method for preparing CsPbX3 perovskite quantum dot film by one-step crystallization Lapsed on the fee record Ended Apr 19, 2026 · USPTO record | Lapsed on the fee record | Ended Apr 19, 2026 | USPTO record |
| US 11,233,639 | Method and Device for Quantum Key Fusion-Based Virtual Power Plant Security Communication and Medium Lapsed on the fee record Ended Jan 25, 2026 · High confidence | Lapsed on the fee record | Ended Jan 25, 2026 | High confidence |
| US 11,175,096 | Strong Cooling Direct Air-Cooled Condenser Radiating Unit and Air-Cooled Island Lapsed on the fee record Ended Nov 16, 2025 · High confidence | Lapsed on the fee record | Ended Nov 16, 2025 | High confidence |
| US 10,500,618 | Apparatus and method for remediating trichloroethylene-polluting soils by integrated rotated migration and PRB Lapsed on the fee record Ended Dec 10, 2023 · USPTO record | Lapsed on the fee record | Ended Dec 10, 2023 | USPTO record |
| US 10,308,140 | A renewable energy-based hybrid bi-directionally interactive DC traction power supply system Held by another company Lapsed on the fee record Ended Jun 4, 2023 · High confidence | Lapsed on the fee record | Ended Jun 4, 2023 | High confidence |
| US 10,014,086 | Integrated method and apparatus for remediation of uranium-contaminated soils Lapsed on the fee record Ended Jul 3, 2022 · USPTO record | Lapsed on the fee record | Ended Jul 3, 2022 | USPTO record |
| US 9,851,415 | Method for Analyzing Operation State of Substation by Combining Whole Grid Model with Local Grid Model Lapsed on the fee record Ended Dec 26, 2021 · High confidence | Lapsed on the fee record | Ended Dec 26, 2021 | High confidence |
| US 8,968,550 | Apparatus and method for cleaning chlorobenzenes-contaminated soil and groundwater Lapsed on the fee record Ended Mar 3, 2019 · USPTO record | Lapsed on the fee record | Ended Mar 3, 2019 | USPTO record |
| US 8,926,814 | Apparatus and method for electrokinetic in-situ leaching remediation of soil Lapsed on the fee record Ended Jan 6, 2019 · USPTO record | Lapsed on the fee record | Ended Jan 6, 2019 | USPTO record |