Nine patents currently held, every record listed here
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
The next term ends in Apr 2037. from the record
Free plan: 3 watched companies. Pro: unlimited.
Alerts on its grants, lapses and transfers.
0
Ending by 2030
Apr 2037
Next term end
5
Patent families
When these terms end
Each bar runs from grant to computed term end. 2020 to 2043.
US 11,682,903
Building Load Modification Responsive to Utility Grid Events Using Robotic Process Automation
Apr 21, 2041
US 11,929,616
Building Load Modification Responsive to Utility Grid Events Using Robotic Process Automation
Apr 21, 2041
US 11,522,364
Building Load Modification Responsive to Utility Grid Events Using Robotic Process Automation
May 28, 2041
US 12,141,820
Greenhouse Gas Emissions Control Based on Marginal Emission Factor Data and Energy Storage Systems
Feb 9, 2043
20252030203520402043
3 pending applications: term is not computable until grant.Updated Nov 15, 2026 · includes USPTO assignment & status data published Nov 15, 2026 and grant & fee data published Nov 10, 2026 (weekly) · how we know
Notable patents
Ranked by citations and family size, against patents of the same kind granted the same year. How we rank
Notable
Ends May 2041 · High confidence
Also notable
Ends Jul 2038 · High confidence
Also notable
Ends Nov 2037 · High confidence
Building Load Modification Responsive to Utility Grid Events Using Robotic Process Automation
US 11,522,364
The newest of the three, granted 2022. It anchors the portfolio to 2041, later than anything else here.
Systems and Methods for Creating Load Peaks and Valleys
US 10,948,937
Granted 2021. Computed term ends 2038.
System and Method for Dynamic Energy Storage System Control
US 10,873,209
The earliest of the three still in force, granted 2020 and renewed since. Its term ends first, in 2037.
Fee deadlines
Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
- 1 fee due Dec 20, 2026The maintenance fee for Building Load Modification Responsive to Utility Grid Events Using Robotic Process Automation (US 11,682,903) comes due Dec 20, 2026. Unpaid by Jun 21, 2027, it lapses early.
- 1 fee due Jun 19, 2027The maintenance fee for Systems and Methods for Creating Load Peaks and Valleys (US 11,846,960) comes due Jun 19, 2027. Unpaid by Dec 20, 2027, it lapses early.
- 1 fee due Sep 12, 2027The maintenance fee for Building Load Modification Responsive to Utility Grid Events Using Robotic Process Automation (US 11,929,616) comes due Sep 12, 2027. Unpaid by Mar 13, 2028, it lapses early.
Recent changes
- 1 of the patents on this record was granted since Aug 17, 2026
What they patent
Grouped by real patent family, largest first, labeled by the earliest filing in each. No technology classification is inferred from titles.
| Building Load Modification Responsive to Utility Grid Events Using Robotic Process Automation | 3 in force | to May 2041 |
| Systems and Methods for Creating Load Peaks and Valleys | 3 in force | to Jul 2038 |
| Systems and Methods of Energy Storage System Operation | 1 in force | to May 2043 |
| Greenhouse Gas Emissions Control Based on Marginal Emission Factor Data and Energy Storage Systems | 1 in force | to Feb 2043 |
| System and Method for Dynamic Energy Storage System Control | 1 in force | to Nov 2037 |
Patents held now
Soonest term end first.
Showing 1 to 9 of 9
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 11,846,960 | Systems and Methods for Creating Load Peaks and Valleys In force · High confidence | In force | High confidence | |
| US 12,748,449 | Systems and Methods for Creating Load Peaks and Valleys In force · High confidence | In force | High confidence | |
| US 10,873,209 | System and Method for Dynamic Energy Storage System Control In force · High confidence | In force | High confidence | |
| US 10,948,937 | Systems and Methods for Creating Load Peaks and Valleys In force · High confidence | In force | High confidence | |
| US 11,682,903 | Building Load Modification Responsive to Utility Grid Events Using Robotic Process Automation In force · High confidence | In force | High confidence | |
| US 11,929,616 | Building Load Modification Responsive to Utility Grid Events Using Robotic Process Automation In force · High confidence | In force | High confidence | |
| US 11,522,364 | Building Load Modification Responsive to Utility Grid Events Using Robotic Process Automation In force · High confidence | In force | High confidence | |
| US 12,141,820 | Greenhouse Gas Emissions Control Based on Marginal Emission Factor Data and Energy Storage Systems In force · High confidence | In force | High confidence | |
| US 12,308,640 | Systems and Methods of Energy Storage System Operation In force · High confidence | In force | High confidence |
Also on record, not counted in the 9: 3 applications pending. List them
Sources and methods
Compiled from USPTO application file histories, grants and recorded assignments, with the company's own names reviewed by hand. How this record was built
Portfolio grouped automatically from ownership conveyances to the names matched to this company, usually every name that begins with its own, so it counts patents an affiliate holds; each list row names the holder of record. Security interests are excluded and ambiguous records are not reviewed by hand.
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.