Prad Research and Development Limited
Records under this name other than the patents Prad Research and Development Limited holds now: patents now held by others, patents whose terms have ended, and its applications, pending or abandoned. None of them is counted in the 6 patents it holds.
Showing 1 to 10 of 10 · Back to Prad Research and Development Limited
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 8,301,429 | Iterative Multi-Scale Method for Flow in Porous Media In force · High confidence | In force | High confidence | |
| US 8,650,016 | Multiscale Finite Volume Method for Reservoir Simulation now held by Chevron U.S.A. Inc. and Schlumberger Technology Corporation In force · Medium confidence | In force | Medium confidence | |
| US 9,416,635 | System and Method of Cutting and Removing Casings from Wellbore now held by Wellbore Integrity Solutions LLC In force · High confidence | In force | High confidence | |
| US 7,716,028 | Method for Modeling a Reservoir Using a 3D Wettability Map Generated from a Wettability Logging Tool held by Schlumberger Technology Corporation, Schlumberger Canada Limited, Services Petroliers Schlumberger, Logined B.V. and Prad Research and Development N.V. Lapsed on the fee record Ended May 11, 2018 · High confidence | Lapsed on the fee record | Ended May 11, 2018 | High confidence |
| US 7,653,488 | Determination of Point of Sand Production Initiation in Wellbores Using Residual Deformation Characteristics and Real Time Monitoring of Sand Production held by Schlumberger Technology Corporation, Schlumberger Canada Limited, Services Petroliers Schlumberger, Schlumberger Holdings Limited, Schlumberger Technology B.V. and Prad Research and Development Limited Lapsed on the fee record Ended Jan 26, 2018 · High confidence | Lapsed on the fee record | Ended Jan 26, 2018 | High confidence |
| US 7,627,429 | Method for Producing Underground Deposits of Hydrocarbon from an Earth Formation Using Fault Interpretation Including Spline Fault Tracking held by Schlumberger Technology Corporation (as Assignee for the United States of America), Schlumberger Canada Limited, Services Petroliers Schlumberger, Logined B.V. and Prad Research and Development N.V. Lapsed on the fee record Ended Dec 1, 2017 · High confidence | Lapsed on the fee record | Ended Dec 1, 2017 | High confidence |
| 12/038,321 | System and Method for Waterflood Performance Monitoring held by Schlumberger Technology Corporation, Schlumberger Canada Limited, Services Petroliers Schlumberger, Schlumberger Holdings Limited, Schlumberger Technology B.V. and Prad Research and Development Limited Abandoned Abandoned Aug 13, 2012 | Abandoned | Abandoned Aug 13, 2012 | |
| 12/323,960 | Using Pocket Device to Survey, Monitor, and Control Production Data in Real Time held by Schlumberger Canada Limited, Schlumberger Technology Corporation, Services Petroliers Schlumberger, Schlumberger Holdings Limited, Schlumberger Technology B.V. and Prad Research and Development Limited Abandoned Abandoned Oct 2, 2012 | Abandoned | Abandoned Oct 2, 2012 | |
| 14/350,517 | Hydraulic Fracturing with Proppant Pulsing Through Clustered Abrasive Perforations now held by Schlumberger Technology Corporation Abandoned Abandoned Jun 23, 2019 | Abandoned | Abandoned Jun 23, 2019 | |
| 15/510,599 | Seismic Inversion Constrained by Real-Time Measurements now held by Schlumberger Technology Corporation Abandoned Abandoned Aug 17, 2020 | Abandoned | Abandoned Aug 17, 2020 |