Pyropower Corporation
Records under this name other than patents Pyropower Corporation holds now: patents now held by others, patents whose terms have ended, and its applications, pending or abandoned.
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 4,522,154 | Fluidized bed combustion boiler Term ended Term ended no later than Jun 11, 2005 · Low confidence | Term ended | Term ended no later than Jun 11, 2005 | Low confidence |
| US 4,756,890 | Reduction of NO.sub.x in flue gas Formerly held Term ended Term ended no later than Jul 12, 2008 · Low confidence | Term ended | Term ended no later than Jul 12, 2008 | Low confidence |
| US 4,920,751 | System and method for reheat steam temperature control in circulating fluidized bed boilers Formerly held Term ended Term ended no later than May 1, 2010 · Low confidence | Term ended | Term ended no later than May 1, 2010 | Low confidence |
| US 5,024,684 | Multi-stage vortex reactor Formerly held Term ended Term ended no later than Jun 18, 2011 · Low confidence | Term ended | Term ended no later than Jun 18, 2011 | Low confidence |
| US 5,038,568 | System for reheat steam temperature control in circulating fluidized bed boilers Formerly held Term ended Term ended no later than Aug 13, 2011 · Low confidence | Term ended | Term ended no later than Aug 13, 2011 | Low confidence |
| US 5,181,381 | Power plant with dual pressure reheat system for process steam supply flexibility Formerly held Term ended Term ended no later than Jan 26, 2013 · Low confidence | Term ended | Term ended no later than Jan 26, 2013 | Low confidence |
| US 5,254,144 | Method and appartus for separating particulate material from combustible gases Formerly held Term ended Term ended no later than Oct 19, 2013 · Low confidence | Term ended | Term ended no later than Oct 19, 2013 | Low confidence |
| US 5,255,507 | Combined cycle power plant incorporating atmospheric circulating fluidized bed boiler and gasifier Formerly held Term ended Term ended no later than Oct 26, 2013 · Low confidence | Term ended | Term ended no later than Oct 26, 2013 | Low confidence |
| US 5,285,629 | Circulating fluidized bed power plant with turbine fueled with sulfur containing fuel and using CFB to control emissions Formerly held Term ended Term ended no later than Feb 15, 2014 · Low confidence | Term ended | Term ended no later than Feb 15, 2014 | Low confidence |
| US 5,309,707 | Control methods and valve arrangement for start-up and shutdown of pressurized combustion and gasification systems integrated with a gas turbine Formerly held Term ended Term ended no later than May 10, 2014 · Low confidence | Term ended | Term ended no later than May 10, 2014 | Low confidence |