1 more in force is now held by another company
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
Recorded under 4 name spellings.
Previously recorded as Societe Technique pour l'Energie Atomique Technicatome (to 2015)
0
Ending by 2030
Jan 2034
Next term end
When these terms end
Held patents by the year their term ends
20262027202820292030203120322033203420352036203720382039204020412042204320442045
Fee deadlines
Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
- 1 fee due Mar 19, 2027The maintenance fee for Nuclear reactor and nuclear reactor vessel equipped with non-ejectable valve (US 11,763,953) comes due Mar 19, 2027. Unpaid by Sep 20, 2027, it lapses early.
- 1 fee due Apr 24, 2027The maintenance fee for Vessel electrical penetration assembly for a nuclear reactor (US 11,798,696) comes due Apr 24, 2027. Unpaid by Oct 25, 2027, it lapses early.
- 1 fee due Aug 13, 2027The maintenance fee for Nuclear reactor with in-vessel ex-core neutron detectors and corresponding control method (US 11,901,089) comes due Aug 13, 2027. Unpaid by Feb 14, 2028, it lapses early.
Recent changes
Nothing was recorded against this company's patents in the last 90 days.
Patents held now
Soonest term end first. Each date below is computed on that patent's own page, which shows the rule, the adjustments and the fee history it was derived from.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 9,905,319 | Plate heat exchanger for homogeneous fluid flows between ducts In force · USPTO record | In force | USPTO record | |
| US 10,163,530 | Nuclear reactor with screw-nut drive of core reactivity control members In force · USPTO record | In force | USPTO record | |
| US 10,861,609 | Vessel electrical penetration assembly for a nuclear reactor In force · USPTO record | In force | USPTO record | |
| US 11,798,696 | Vessel electrical penetration assembly for a nuclear reactor In force · USPTO record | In force | USPTO record | |
| US 10,910,118 | Electrical penetration assembly for a nuclear reactor vessel In force · USPTO record | In force | USPTO record | |
| US 10,930,402 | Nuclear reactor with heating elements housed in their entirety in an integrated pressurizer In force · USPTO record | In force | USPTO record | |
| US 10,748,665 | Nuclear-reactor control-absorber drive mechanism and corresponding monitoring method and nuclear reactor In force · USPTO record | In force | USPTO record | |
| US 11,211,173 | Nuclear reactor integrating a safety primary heat exchanger In force · USPTO record | In force | USPTO record | |
| US 11,901,089 | Nuclear reactor with in-vessel ex-core neutron detectors and corresponding control method In force · USPTO record | In force | USPTO record | |
| US 11,342,083 | Integrated nuclear reactor architecture limiting the stress applied to the integrated mechanisms In force · USPTO record | In force | USPTO record |
Also on record, not counted in the 12: 1 patent in force now held by others. List them
Sources and methods
Compiled from the USPTO record, grants, published applications and recorded assignments, not yet reviewed by hand.
How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
Published applications
US patent applications published under this name that have not become patents. An application is published about eighteen months after its earliest filing; one that has not been published is in no public record.
1 pending