Societe Anonyme Dite: Framatome
Records under this name other than patents Societe Anonyme Dite: Framatome holds now: patents now held by others, patents whose terms have ended, and its applications, pending or abandoned.
Back to Societe Anonyme Dite: Framatome
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 4,842,805 | Method of detecting that an anti-reactive element has fallen into the reactor of a nuclear power station, and a power station protected against such a fall Term ended Term ended no later than Jun 27, 2009 · Low confidence | Term ended | Term ended no later than Jun 27, 2009 | Low confidence |
| US 4,866,840 | Method of connecting a mineral-insulated electric cable, in particular in the reactor building of a nuclear boiler Term ended Term ended no later than Sep 19, 2009 · Low confidence | Term ended | Term ended no later than Sep 19, 2009 | Low confidence |
| US 4,948,551 | Method of protecting a pressurized water nuclear reactor against failures in its emergency stop means Term ended Term ended no later than Aug 14, 2010 · Low confidence | Term ended | Term ended no later than Aug 14, 2010 | Low confidence |
| US 4,978,834 | Method and apparatus for remotely welding a bush inside a tube, in particular in a steam generator in a nuclear power station Term ended Term ended no later than Dec 18, 2010 · Low confidence | Term ended | Term ended no later than Dec 18, 2010 | Low confidence |
| US 4,983,350 | Method and apparatus for detecting the fall of a control cluster in a nuclear reactor Term ended Term ended no later than Jan 8, 2011 · Low confidence | Term ended | Term ended no later than Jan 8, 2011 | Low confidence |
| US 4,986,952 | Protection system for protecting a nuclear reactor in the event of a reaction-inhibiting element falling Term ended Term ended no later than Jan 22, 2011 · Low confidence | Term ended | Term ended no later than Jan 22, 2011 | Low confidence |
| US 5,032,346 | Method of determining and evaluating the emergency shutdown margin for a pressurized water nuclear reactor Formerly held Term ended Term ended no later than Jul 16, 2011 · Low confidence | Term ended | Term ended no later than Jul 16, 2011 | Low confidence |
| US 5,039,473 | Method of determining and evaluating the power return capacity of a pressurized water nuclear reactor Term ended Term ended no later than Aug 13, 2011 · Low confidence | Term ended | Term ended no later than Aug 13, 2011 | Low confidence |
| US 5,059,382 | Method of renovating the control system for controlling control clusters in a nuclear reactor, and a corresponding control system Term ended Term ended no later than Oct 22, 2011 · Low confidence | Term ended | Term ended no later than Oct 22, 2011 | Low confidence |
| US 5,085,509 | Apparatus and method for aligning an optical beam Term ended Term ended no later than Feb 4, 2012 · Low confidence | Term ended | Term ended no later than Feb 4, 2012 | Low confidence |