1 more in force is now held by another company
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
0
Ending by 2030
Oct 2035
Next term end
When these terms end
Held patents by the year their term ends
20262027202820292030203120322033203420352036203720382039204020412042204320442045
Fee deadlines
Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
- 1 fee due Dec 18, 2026The maintenance fee for Watertube Panel Portion and a Method of Manufacturing a Watertube Panel Portion in a Fluidized Bed Reactor (US 10,323,842) comes due Dec 18, 2026. Unpaid by Jun 21, 2027, it lapses early.
- 2 fees due Jun 10 to 26, 2027 · next Jun 10
Recent changes
- 1 of the patents on this record was granted since Aug 27, 2026
- Nov 3 US 12,780,714 Arrangement for and a Method of Recycling Mineral Wool Waste
Patents held now
Soonest term end first. Each date below is computed on that patent's own page, which shows the rule, the adjustments and the fee history it was derived from.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 9,964,301 | Fluidized bed boiler with a support construction for a particle separator In force · USPTO record | In force | USPTO record | |
| US 10,138,785 | Arrangement for and method of feeding ammonia containing fluid into the exhaust gas passage of a combustion plant In force · USPTO record | In force | USPTO record | |
| US 11,499,709 | Bottom-supported boiler having a boiler pressure body and a four vertical column support construction In force · USPTO record | In force | USPTO record | |
| US 10,105,647 | Method of reducing sulfur dioxide content in flue gas emanating from a circulating fluidized bed boiler plant In force · USPTO record | In force | USPTO record | |
| US 10,323,842 | Watertube Panel Portion and a Method of Manufacturing a Watertube Panel Portion in a Fluidized Bed Reactor In force · High confidence | In force | High confidence | |
| US 10,502,413 | Circulating fluidized bed boiler and a method of assembling a circulating fluidized bed boiler In force · USPTO record | In force | USPTO record | |
| US 10,118,147 | Tubular waterwall structure in a fluidized bed reaction chamber and a fluidized bed reaction chamber In force · USPTO record | In force | USPTO record | |
| US 11,079,108 | Fluidized bed boiler plant and a method of preheating combustion gas in a fluidized bed boiler plant In force · USPTO record | In force | USPTO record | |
| US 11,209,158 | Boiler construction having a boiler pressure body support system In force · USPTO record | In force | USPTO record | |
| US 11,143,398 | Boiler system with a support construction In force · USPTO record | In force | USPTO record |
Also on record, not counted in the 20: 1 patent in force now held by others. List them
Sources and methods
Compiled from the USPTO record, grants, published applications and recorded assignments, not yet reviewed by hand.
How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
Published applications
US patent applications published under this name that have not become patents. An application is published about eighteen months after its earliest filing; one that has not been published is in no public record.
7 pending · 1 no status recorded
Showing 1 to 8 of 8, newest filing first. An application has no patent term. A term is computed when and if it grants, and appears on that patent's own page. Where no title is shown, the bulk publication record carries none and this site holds no USPTO file history for that application.
| Application | Title | Filed | Status |
|---|---|---|---|
| 18/688,477 | Method of Operating a Heat Releasing Reactor, a Heat Releasing Reactor, and a Computation System for a Heat Releasing Reactor | Sep 9, 2022 | Pending |
| 18/687,991 | Method of Determining a Local Temperature Anomaly in a Fluidized Bed of a Reactor, Method of Calibrating a Numerical Model of a Fluidized Bed of a Reactor, Method of Estimating Risk of a Fluidized Bed Reactor Bed Sintering, Method of Controlling a Fluidized Bed Reactor, as Well as a Reactor | Sep 9, 2022 | Pending |
| 18/686,096 | Method of Determining a Leakage in a Heat Transfer Fluid Channel of a Heat Transferring Reactor System, and a Heat Transferring Reactor | Sep 9, 2022 | Pending |
| 18/866,406 | Method of and Control System for Monitoring a Process of Circulation of Solid Material in a Circulating Fluidized Bed Reactor | May 19, 2022 | Pending |
| 18/688,466 | Combustion Boiler Control Method, Combustion Boiler, and Boiler Computation System | Sep 9, 2021 | Pending |
| 18/688,037 | Method of Determining a Local Temperature Anomaly in a Fluidized Bed of a Combustion Boiler, Method of Calibrating a Numerical Model of a Fluidized Bed of a Combustion Boiler, Method of Estimating a Risk of Fluidized Bed Combustion Boiler Bed Sintering, Method of Controlling a Fluidized Bed Boiler, as Well as a Combustion Boiler | Sep 9, 2021 | Pending |
| 18/576,482 | Method of Determining a Tube Leakage in a Water-Steam Circuit of a Combustion Boiler System, and a Combustion Boiler | Sep 9, 2021 | Pending |
| 17/635,132 | Aug 29, 2019 | No status recorded |