The Patent Finder

Sumitomo Shi FW Energia Oy

20 patents currently held · Updated Nov 25, 2026
1 more in force is now held by another company
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
0
Ending by 2030
Oct 2035
Next term end

When these terms end

Held patents by the year their term ends
20262027202820292030203120322033203420352036203720382039204020412042204320442045

Fee deadlines

Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
  • 1 fee due Dec 18, 2026
    The maintenance fee for Watertube Panel Portion and a Method of Manufacturing a Watertube Panel Portion in a Fluidized Bed Reactor (US 10,323,842) comes due Dec 18, 2026. Unpaid by Jun 21, 2027, it lapses early.
  • 2 fees due Jun 10 to 26, 2027 · next Jun 10

Which patents, and when each one lapses · Pro

Recent changes

  • 1 of the patents on this record was granted since Aug 27, 2026

Patents held now

Soonest term end first. Each date below is computed on that patent's own page, which shows the rule, the adjustments and the fee history it was derived from.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
PatentTitleStatus Expires Confidence
US 9,964,301Fluidized bed boiler with a support construction for a particle separator
In force
 · USPTO record
In forceUSPTO record
US 10,138,785Arrangement for and method of feeding ammonia containing fluid into the exhaust gas passage of a combustion plant
In force
 · USPTO record
In forceUSPTO record
US 11,499,709Bottom-supported boiler having a boiler pressure body and a four vertical column support construction
In force
 · USPTO record
In forceUSPTO record
US 10,105,647Method of reducing sulfur dioxide content in flue gas emanating from a circulating fluidized bed boiler plant
In force
 · USPTO record
In forceUSPTO record
US 10,323,842Watertube Panel Portion and a Method of Manufacturing a Watertube Panel Portion in a Fluidized Bed Reactor
In force
 · High confidence
In forceHigh confidence
US 10,502,413Circulating fluidized bed boiler and a method of assembling a circulating fluidized bed boiler
In force
 · USPTO record
In forceUSPTO record
US 10,118,147Tubular waterwall structure in a fluidized bed reaction chamber and a fluidized bed reaction chamber
In force
 · USPTO record
In forceUSPTO record
US 11,079,108Fluidized bed boiler plant and a method of preheating combustion gas in a fluidized bed boiler plant
In force
 · USPTO record
In forceUSPTO record
US 11,209,158Boiler construction having a boiler pressure body support system
In force
 · USPTO record
In forceUSPTO record
US 11,143,398Boiler system with a support construction
In force
 · USPTO record
In forceUSPTO record
10 of 20 patents shown.
Pro members see all 20.
Pro members: see all 20 patents
Also on record, not counted in the 20: 1 patent in force now held by others. List them

Sources and methods

Compiled from the USPTO record, grants, published applications and recorded assignments, not yet reviewed by hand. How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.

Published applications

US patent applications published under this name that have not become patents. An application is published about eighteen months after its earliest filing; one that has not been published is in no public record.

7 pending · 1 no status recorded

Showing 1 to 8 of 8, newest filing first. An application has no patent term. A term is computed when and if it grants, and appears on that patent's own page. Where no title is shown, the bulk publication record carries none and this site holds no USPTO file history for that application.

ApplicationTitleFiledStatus
18/688,477Method of Operating a Heat Releasing Reactor, a Heat Releasing Reactor, and a Computation System for a Heat Releasing ReactorSep 9, 2022Pending
18/687,991Method of Determining a Local Temperature Anomaly in a Fluidized Bed of a Reactor, Method of Calibrating a Numerical Model of a Fluidized Bed of a Reactor, Method of Estimating Risk of a Fluidized Bed Reactor Bed Sintering, Method of Controlling a Fluidized Bed Reactor, as Well as a ReactorSep 9, 2022Pending
18/686,096Method of Determining a Leakage in a Heat Transfer Fluid Channel of a Heat Transferring Reactor System, and a Heat Transferring ReactorSep 9, 2022Pending
18/866,406Method of and Control System for Monitoring a Process of Circulation of Solid Material in a Circulating Fluidized Bed ReactorMay 19, 2022Pending
18/688,466Combustion Boiler Control Method, Combustion Boiler, and Boiler Computation SystemSep 9, 2021Pending
18/688,037Method of Determining a Local Temperature Anomaly in a Fluidized Bed of a Combustion Boiler, Method of Calibrating a Numerical Model of a Fluidized Bed of a Combustion Boiler, Method of Estimating a Risk of Fluidized Bed Combustion Boiler Bed Sintering, Method of Controlling a Fluidized Bed Boiler, as Well as a Combustion BoilerSep 9, 2021Pending
18/576,482Method of Determining a Tube Leakage in a Water-Steam Circuit of a Combustion Boiler System, and a Combustion BoilerSep 9, 2021Pending
17/635,132Aug 29, 2019No status recorded
The Patent Finder CompaniesExpirationsCalculatorWatchlistPricing MethodologyCorrectionsLegalPrivacysupport@thepatentfinder.com Updated Nov 25, 2026 · includes USPTO assignment data published Nov 24, 2026, status data published Nov 25, 2026 and grant & fee data published Nov 24, 2026 (weekly) Part of 137 Finder · © 2026 137 Finder LLC · Sources cited