The Patent Finder
US

Supply of Air to an Air-Conditioning Circuit of an Aircraft Cabin from Its Turboprop Engine

US 10,703,487 In force
OverviewFamilyAssignmentsSources & methods

Also listed on Safran, an earlier holder on the record. The recorded assignments below show how it moved.

Term ends Jun 19, 2036 · High confidence

Filed Jul 28, 2016 as application 15/115,116 · Granted Jul 7, 2020
Base term plus 507 days of patent term adjustment (USPTO delay)
Today
20 years from filing
2015 2036
Clock starts
Jan 29, 2015
Term ends
Jun 19, 2036
Granted
Jul 7, 2020
base term patent term adjustment fee events Updated Nov 20, 2026 · includes USPTO assignment data published Nov 19, 2026, status data published Nov 20, 2026 and grant & fee data published Nov 17, 2026 (weekly) · how we know
507
Days of term adjustment
Read from the USPTO patent term adjustment record, not recalculated here.
None
Terminal disclaimer
No disclaimer on this record.
1 of 3
Maintenance fees paid
Three maintenance fees fall due, at 3.5, 7.5 and 11.5 years from grant. This counts the ones the record shows paid.
2
Family applications on record here
Applications sharing this one's continuity chain, as the file histories and patent records this site holds name them. The family may have others.

This patent's term runs 507 days past its 20-year base term on prosecution delay. 1 of 3 maintenance fees is paid so far. Confidence: High. from the record

How we calculated this date

One row per rule, each showing its own input and what it did to the date. A step we could not verify says so instead of resolving itself.
StepInputDate after this stepConfidence
Base term, 20 years from filingClock starts Jan 29, 2015, when application PCT/FR2015/050215, the earliest non-provisional in its chain, was filed (this one was filed Jul 28, 2016)Jan 29, 2035High confidence
Continuity chainEvery parent in the chain resolvedno changeHigh confidence
Patent term adjustment+507 days, USPTO patent term adjustment recordJun 19, 2036High confidence
Terminal disclaimer capNone on recordno cap appliedHigh confidence
Patent term extensionNone on fileno changeHigh confidence
Fee events1 of 3 maintenance fees paidIn forceHigh confidence
Computed term endThe steps above, in orderJun 19, 2036High confidence

Partial family

Application PCT/FR2015/050215PCT application
no patent term
no patent term
US 10,703,487this patent
Jun 2036
Jun 2036
Partial: 1 of the 2 has no file history here, so its row comes from the patent's own record or names the application alone. The family may have others.

Assignments

Assignment documents as recorded at the USPTO, oldest first, with the reel and frame each was recorded at. A recorded assignment is a filed document, not a statement of current ownership, and the absence of a later one is not evidence that the last one still stands.
RecordedAssignorAssigneeConveyance
Nov 3, 2016
Reel 40218, frame 432
Parmentier, Nicolas Claude; Froment, Pierre; Rideau, Jean-François; Thoraval, BrunoSafran Aircraft Engines; Safran; Safran Power UnitsAssignment of Assignor's Interest
Nov 3, 2016
reel/frame not recorded
Parmentier, Nicolas Claude; Thoraval, Bruno; Froment, Pierre; Rideau, Jean-FrançoisSafran Aircraft EnginesAssignment of Assignor's Interest
Nov 3, 2016
reel/frame not recorded
Parmentier, Nicolas Claude; Thoraval, Bruno; Froment, Pierre; Rideau, Jean-FrançoisSafranAssignment of Assignor's Interest
Nov 3, 2016
reel/frame not recorded
Parmentier, Nicolas Claude; Thoraval, Bruno; Froment, Pierre; Rideau, Jean-FrançoisSafran Power UnitsAssignment of Assignor's Interest

Sources

Google Patents · The patent document at USPTO · Assignment records at USPTO

USPTO account required: This application in Patent Center · USPTO's maintenance fee lookup

Maintenance fee events come from USPTO's own fee records. Its fee lookup asks for the patent number and the application number.

The Patent Finder CompaniesExpirationsCalculatorWatchlistPricing MethodologyCorrectionsLegalPrivacysupport@thepatentfinder.com Updated Nov 20, 2026 · includes USPTO assignment data published Nov 19, 2026, status data published Nov 20, 2026 and grant & fee data published Nov 17, 2026 (weekly) Part of 137 Finder · © 2026 137 Finder LLC · Sources cited