Term ends Nov 30, 2028 · High confidence
20-year base term ends Aug 25, 2028
Held by Vista Outdoor Operations LLC
Filed Aug 15, 2017 as application 15/677,803 · Granted Nov 2, 2021
Base term plus 97 days of patent term adjustment (USPTO delay)
Today
2008
2028
Clock starts
Aug 25, 2008
Aug 25, 2008
Term ends
Nov 30, 2028
Nov 30, 2028
Granted
Nov 2, 2021
Nov 2, 2021
base term
patent term adjustment
fee events
Updated Nov 17, 2026 · includes USPTO assignment data published Nov 16, 2026, status data published Nov 17, 2026 and grant & fee data published Nov 17, 2026 (weekly) · how we know
97
Days of term adjustment
Read from the USPTO patent term adjustment record, not recalculated here.
No effect
Terminal disclaimer
Resolved from the filed document, referencing US 9,730,704, to Nov 30, 2028. The term already ends on or before that date, so the cap shortened nothing.
1 of 1
Maintenance fees paid
One maintenance fee can end this term early, the one due 3.5 years from grant; the next one's grace period runs past the term end. This counts it if the record shows it paid.
3
Family applications on record here
Applications sharing this one's continuity chain, as the file histories and patent records this site holds name them. The family may have others.
This patent's term runs 97 days past its 20-year base term on prosecution delay. A terminal disclaimer is resolved from the filed document, and it ends no earlier than this term, so it shortens nothing. 1 of 1 maintenance fees is paid so far. Confidence: High. from the record
How we calculated this date
One row per rule, each showing its own input and what it did to the date. A step we could not verify says so instead of resolving itself.
| Step | Input | Date after this step | Confidence |
|---|---|---|---|
| Base term, 20 years from filing | Clock starts Aug 25, 2008, when application PCT/US2008/010053, the earliest non-provisional in its chain, was filed (this one was filed Aug 15, 2017) | Aug 25, 2028 | High confidence |
| Continuity chain | Every parent in the chain resolved | no change | High confidence |
| Patent term adjustment | +97 days, USPTO patent term adjustment record | Nov 30, 2028 | High confidence |
| Terminal disclaimer cap | Disclaimer resolved from the filed document (refs US 9,730,704) | resolves to Nov 30, 2028, no earlier than this term, so no change | High confidence |
| Patent term extension | None on file | no change | High confidence |
| Fee events | 1 of 1 maintenance fees paid | In force | High confidence |
| Computed term end | The steps above, in order | Nov 30, 2028 | High confidence |
Partial family
| Application PCT/US2008/010053 | PCT application no patent term | no patent term |
| US 9,730,704 | In force Nov 2030 | Nov 2030 |
| US 11,160,560 | this patent Nov 2028 | Nov 2028 |
Partial: 1 of the 3 has no file history here, so its row comes from the patent's own record or names the application alone. The family may have others.
Assignments
Assignment documents as recorded at the USPTO, oldest first, with the reel and frame each was recorded at. A recorded assignment is a filed document, not a statement of current ownership, and the absence of a later one is not evidence that the last one still stands.
| Recorded | Assignor | Assignee | Conveyance |
|---|---|---|---|
| Mar 23, 2020 Reel 52198, frame 67 | Rose, Keith J.; Yeates, Eric M.; Gantar, Mark D.; Gregory, Thomas M.; Kincaid, Robert A.; Siberell, Richard; Cook, Clifton L.; Marx, Thomas A. | Blackhawk Industries Product Group Unlimited LLC | Assignment of Assignor's Interest |
| Mar 23, 2020 Reel 52198, frame 106 | Blackhawk Industries Product Group Unlimited LLC | Alliant Techsystems Inc. | Nunc Pro Tunc Assignment |
| Mar 23, 2020 Reel 52198, frame 288 | Rose, J. Keith, DR. | Salang, LLC | Assignment of Assignor's Interest |
| Mar 23, 2020 Reel 52206, frame 372 | Alliant Techsystems Inc. | Vista Outdoor Operations LLC | Assignment of Assignor's Interest |
| Mar 23, 2020 Reel 52206, frame 402 | Vista Outdoor Operations LLC | Rose, J. Keith | Quitclaim Assignment |
Sources
Google Patents · The patent document at USPTO · Assignment records at USPTO
USPTO account required: This application in Patent Center · USPTO's maintenance fee lookup
Maintenance fee events come from USPTO's own fee records. Its fee lookup asks for the patent number and the application number.
What's changing
Nov 2028
Term ends Nov 30, 2028. No further fees fall due before then
Note
The 97 days of patent term adjustment (USPTO delay) are read from the USPTO record, not recalculated by us
Terminal disclaimer
A terminal disclaimer resolved from the filed document, referencing US 9,730,704, ends no earlier than this term, so it caps nothing.
Citations
1
later US patent cites this one
That is below the median of utility patents granted in 2021 in our data, the only group it is compared against.
How we rank
Every date shows its work: the base term, any term adjustment or extension, any disclaimer cap, and the maintenance fee record, each with a confidence tier. How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
In force means the term is running and no lapse is on record. It is not a finding that the patent is valid.