Also listed on Climate Energy Investments, LLC, an earlier holder on the record. The recorded assignments below show how it moved.
Term ends Feb 26, 2041 · High confidence
20-year base term ends Feb 26, 2041
Held by Diamond Power, Inc.
Filed Sep 16, 2021 as application 17/477,106 · Granted Aug 30, 2022
Base term, 20 years from filing
Today
2021
2041
Clock starts
Feb 26, 2021
Feb 26, 2021
Term ends
Feb 26, 2041
Feb 26, 2041
Granted
Aug 30, 2022
Aug 30, 2022
base term
fee events
Updated Nov 15, 2026 · includes USPTO assignment & status data published Nov 15, 2026 and grant & fee data published Nov 10, 2026 (weekly) · how we know
None
Term adjustment
No prosecution delay on this record.
None
Terminal disclaimer
No disclaimer on this record.
1 of 3
Maintenance fees paid
Three maintenance fees fall due, at 3.5, 7.5 and 11.5 years from grant. This counts the ones the record shows paid.
6
Family applications on record here
Applications sharing this one's continuity chain whose file history this site holds. The family may have others.
This patent's term is its 20-year base term, with no adjustment for prosecution delay. 1 of 3 maintenance fees is paid so far. Confidence: High. from the record
How we calculated this date
One row per rule, each showing its own input and what it did to the date. A step we could not verify says so instead of resolving itself.
| Step | Input | Date after this step | Confidence |
|---|---|---|---|
| Base term, 20 years from filing | Clock starts Feb 26, 2021, when application PCT/US2021/019930, the earliest non-provisional in its chain, was filed (this one was filed Sep 16, 2021) | Feb 26, 2041 | High confidence |
| Continuity chain | Every parent in the chain resolved | no change | High confidence |
| Patent term adjustment | None on file | no change | High confidence |
| Terminal disclaimer cap | None on record | no cap applied | High confidence |
| Patent term extension | None on file | no change | High confidence |
| Fee events | 1 of 3 maintenance fees paid | In force | High confidence |
| Computed term end | The steps above, in order | Feb 26, 2041 | High confidence |
This family
| Application PCT/US2021/019930 | PCT application no patent term | no patent term |
| US 11,428,186 | this patent Feb 2041 | Feb 2041 |
| US 11,959,434 | In force Feb 2041 | Feb 2041 |
| US 11,976,606 | In force Feb 2041 | Feb 2041 |
| US 11,952,954 | In force Feb 2041 | Feb 2041 |
| US 12,710,015 | In force Feb 2041 | Feb 2041 |
The applications whose file history this site holds. The family may have others.
Assignments
Assignment documents as recorded at the USPTO, oldest first, with the reel and frame each was recorded at. A recorded assignment is a filed document, not a statement of current ownership, and the absence of a later one is not evidence that the last one still stands.
| Recorded | Assignor | Assignee | Conveyance |
|---|---|---|---|
| Mar 18, 2022 Reel 59313, frame 341 | Blumreiter, Julie; Johnson, Bernard; Schanz, Robert | Clearflame Engines, Inc. | Assignment of Assignor's Interest |
| Dec 23, 2024 Reel 69663, frame 153 | Clearflame Engines, Inc. | First-Citizens Bank & Trust Company | Security Interest |
| Nov 13, 2025 Reel 72886, frame 212 | Clearflame Engines, Inc. | Clearflame Technologies ABC, LLC | Assignment of Assignor's Interest |
| Nov 13, 2025 Reel 72886, frame 220 | Clearflame Technologies ABC, LLC | Climate Energy Investments, LLC | Assignment of Assignor's Interest |
| Nov 4, 2026 Reel 76623, frame 986 | Climate Energy Investments, LLC | Diamond Power, Inc. | Assignment of Assignor's Interest |
Sources
Google Patents · The patent document at USPTO · Assignment records at USPTO
USPTO account required: This application in Patent Center · USPTO's maintenance fee lookup
Maintenance fee events come from USPTO's own fee records. Its fee lookup asks for the patent number and the application number.
Free plan: 3 watched companies. Pro: unlimited.
Alerts on its grants, lapses and transfers.
What's changing
Feb 2041
Term ends Feb 26, 2041. Maintenance fees still fall due before then
Citations
14
later US patents cite this one
That is top 10% of utility patents granted in 2022 in our data, the only group it is compared against.
How we rank
Every date shows its work: the base term, any term adjustment or extension, any disclaimer cap, and the maintenance fee record, each with a confidence tier. How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
In force means the term is running and no lapse is on record. It is not a finding that the patent is valid.