Term ends Aug 13, 2038 · High confidence
20-year base term ends Aug 13, 2038
Filed Nov 16, 2021 as application 17/527,948 · Granted Nov 21, 2023
Base term, 20 years from filing
Today
2018
2038
Clock starts
Aug 13, 2018
Aug 13, 2018
Term ends
Aug 13, 2038
Aug 13, 2038
Granted
Nov 21, 2023
Nov 21, 2023
base term
Updated Nov 23, 2026 · includes USPTO assignment data published Nov 22, 2026, status data published Nov 23, 2026 and grant & fee data published Nov 17, 2026 (weekly) · how we know
None
Term adjustment
No prosecution delay on this record.
No effect
Terminal disclaimer
Resolved from the filed document, referencing US 11,339,094, to Aug 13, 2038. The term already ends on or before that date, so the cap shortened nothing.
0 of 3
Maintenance fees paid
Three maintenance fees fall due, at 3.5, 7.5 and 11.5 years from grant. This counts the ones the record shows paid.
3
Family applications on record here
Applications sharing this one's continuity chain, as the file histories and patent records this site holds name them. The family may have others.
This patent's term is its 20-year base term, with no adjustment for prosecution delay. A terminal disclaimer is resolved from the filed document, and it ends no earlier than this term, so it shortens nothing. 0 of 3 maintenance fees are paid so far. Confidence: High. from the record
How we calculated this date
One row per rule, each showing its own input and what it did to the date. A step we could not verify says so instead of resolving itself.
| Step | Input | Date after this step | Confidence |
|---|---|---|---|
| Base term, 20 years from filing | Clock starts Aug 13, 2018, when application PCT/US2018/046557, the earliest non-provisional in its chain, was filed (this one was filed Nov 16, 2021) | Aug 13, 2038 | High confidence |
| Continuity chain | Every parent in the chain resolved | no change | High confidence |
| Patent term adjustment | None on file | no change | High confidence |
| Terminal disclaimer cap | Disclaimer resolved from the filed document (refs US 11,339,094) | resolves to Aug 13, 2038, no earlier than this term, so no change | High confidence |
| Patent term extension | None on file | no change | High confidence |
| Fee events | 0 of 3 maintenance fees paid | In force | High confidence |
| Computed term end | The steps above, in order | Aug 13, 2038 | High confidence |
This family
| Application PCT/US2018/046557 | PCT application no patent term | no patent term |
| US 11,339,094 | In force Nov 2038 | Nov 2038 |
| US 11,820,710 | this patent Aug 2038 | Aug 2038 |
Every application listed has its file history here. The family may have others.
Assignments
Assignment documents as recorded at the USPTO, oldest first, with the reel and frame each was recorded at. A recorded assignment is a filed document, not a statement of current ownership, and the absence of a later one is not evidence that the last one still stands.
| Recorded | Assignor | Assignee | Conveyance |
|---|---|---|---|
| May 10, 2022 Reel 59925, frame 946 | University of California Los Angeles | United States Department of Energy | Confirmatory License |
| Nov 16, 2022 Reel 61791, frame 206 | Sant, Guarav N.; Falzone, Gabriel D.; Oey, Tandre | The Regents of the University of California | Assignment of Assignor's Interest |
| Nov 16, 2022 Reel 61791, frame 224 | La Plante, Erika Callagon | The Regents of the University of California | Assignment of Assignor's Interest |
| Nov 16, 2022 Reel 61791, frame 237 | Wolfram, Franke | Yara International ASA | Assignment of Assignor's Interest |
| Nov 16, 2022 Reel 61791, frame 280 | Seiler, Paul | BASF Corporation | Assignment of Assignor's Interest |
| Nov 16, 2022 Reel 61791, frame 295 | BASF Corporation | Construction Research & Technology GmbH | Assignment of Assignor's Interest |
| Jun 16, 2023 Reel 64007, frame 625 | Franke, Wolfram | Yara International ASA | Corrective Assignment to Correct the Franke Wolfram Should Be Wolfram Franke Previously Recorded on Reel 061791 Frame 0237. Assignor(S) Hereby Confirms the Assignment. |
Sources
Google Patents · The patent document at USPTO · Assignment records at USPTO
USPTO account required: This application in Patent Center · USPTO's maintenance fee lookup
Maintenance fee events come from USPTO's own fee records. Its fee lookup asks for the patent number and the application number.
Free plan: 3 watched companies. Pro: unlimited.
Alerts on its grants, lapses and transfers.
What's changing
Aug 2038
Term ends Aug 13, 2038. Maintenance fees still fall due before then
Terminal disclaimer
A terminal disclaimer resolved from the filed document, referencing US 11,339,094, ends no earlier than this term, so it caps nothing.
Citations
9
later US patents cite this one
That is top 10% of utility patents granted in 2023 in our data, the only group it is compared against.
How we rank
Every date shows its work: the base term, any term adjustment or extension, any disclaimer cap, and the maintenance fee record, each with a confidence tier. How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
In force means the term is running and no lapse is on record. It is not a finding that the patent is valid.