The Patent Finder
US

Flow Control Riser Within a Stormwater Treatment System

US 11,926,548 In force
OverviewFamilyAssignmentsSources & methods
Collateral for a security interest recorded Feb 10, 2025 (U.S. Bank Trust Company, National Association).

Term ends Aug 22, 2031 · High confidence

Filed Aug 3, 2020 as application 16/984,020 · Granted Mar 12, 2024
Base term plus 169 days of patent term adjustment (USPTO delay) · capped by a resolved terminal disclaimer
Today
20 years from filing
2019 2039
Clock starts
Nov 24, 2019
Term ends
Aug 22, 2031
Granted
Mar 12, 2024
base term after the term ends Updated Nov 27, 2026 · includes USPTO assignment data published Nov 26, 2026, status data published Nov 27, 2026 and grant & fee data published Nov 24, 2026 (weekly) · how we know
169
Days of term adjustment
Read from the USPTO patent term adjustment record, not recalculated here.
Capped
Terminal disclaimer
Resolved from the filed document, referencing US 10,294,135, US 11,053,147, US 8,303,816, US 8,771,515, US 9,409,805.
0 of 1
Maintenance fees paid
One maintenance fee can end this term early, the one due 3.5 years from grant; the next one's grace period runs past the term end. This counts it if the record shows it paid.
9
Family applications on record here
Applications sharing this one's continuity chain, as the file histories and patent records this site holds name them. The family may have others.

This patent's term runs 169 days past its 20-year base term on prosecution delay. A terminal disclaimer resolved from the filed document caps it earlier. 0 of 1 maintenance fees are paid so far. Confidence: High. from the record

How we calculated this date

One row per rule, each showing its own input and what it did to the date. A step we could not verify says so instead of resolving itself.
StepInputDate after this stepConfidence
Base term, 20 years from filingClock starts Nov 24, 2019, when application 62/939,634, the earliest non-provisional in its chain, was filed (this one was filed Aug 3, 2020)Nov 24, 2039High confidence
Continuity chainEvery parent in the chain resolvedno changeHigh confidence
Patent term adjustment+169 days, USPTO patent term adjustment recordMay 11, 2040High confidence
Terminal disclaimer capDisclaimer resolved from the filed document (refs US 10,294,135, US 11,053,147, US 8,303,816, US 8,771,515, US 9,409,805)capped to Aug 22, 2031High confidence
Patent term extensionNone on fileno changeHigh confidence
Fee events0 of 1 maintenance fees paidIn forceHigh confidence
Computed term endThe steps above, in orderAug 22, 2031High confidence

This family

US 8,303,816In force (reinstated)
Aug 2031
Aug 2031
US 8,940,170In force
Jun 2033
Jun 2033
US 8,771,515In force
Aug 2031
Aug 2031
US 9,409,805In force
Aug 2031
Aug 2031
US 10,294,135In force
Aug 2031
Aug 2031
US 11,053,147In force
Aug 2031
Aug 2031
US 11,926,548this patent
Aug 2031
Aug 2031
US 12,281,035In force
Aug 2031
Aug 2031
8 of 9 applications in this family shown, earliest filings first. Every application listed has its file history here. The family may have others.

Assignments

Assignment documents as recorded at the USPTO, oldest first, with the reel and frame each was recorded at. A recorded assignment is a filed document, not a statement of current ownership, and the absence of a later one is not evidence that the last one still stands.
RecordedAssignorAssigneeConveyance
Mar 18, 2022
Reel 59314, frame 17
Modular Wetland Systems, Inc.Wells Fargo Bank, N.A., as AgentSecurity Interest
Mar 23, 2022
Reel 59479, frame 437
United States Pipe and Foundry Company, LLC; Griffin Pipe Products Co., LLC; Custom Fab, Inc.; Bio Clean Environmental Services, Inc.; Modular Wetland Systems, Inc.; Forterra Pipe & Precast, LLC; Forterra Concrete Products, Inc.; Forterra Precast Concepts, LLC; Best Block, LLC; Pavestone, LLC; Contech Engineered Solutions LLC; Keystone Retaining Wall Systems LLCWells Fargo Bank, National Association, as AgentPatent Security Agreement (ABL)
Sep 4, 2024
Reel 68834, frame 213
Kent, Greg B.; Kent, Zachariha J.; Spolar, AnthonyBio Clean Environmental Services, LLCAssignment of Assignor's Interest
Sep 4, 2024
Reel 68836, frame 331
Bio Clean Environmental Services, Inc.Bio Clean Environmental Services, LLCArticles of Conversion
Jan 28, 2025
Reel 70031, frame 163
Bio Clean Environmental Services, LLCContech Engineered Solutions LLCMerger
Feb 10, 2025
Reel 70170, frame 919
Best Block, LLC; Contech Engineered Solutions LLC; Custom Building Products, LLC; Forterra Concrete Products, LLC; Forterra Pipe & Precast, LLC; Keystone Retaining Wall Systems LLC; Pavestone, LLC; The Quikrete Companies, LLC; United States Pipe and Foundry Company, LLC; USP Holdings, LLCU.S. Bank Trust Company, National AssociationPatent Security Agreement

Sources

Google Patents · The patent document at USPTO · Assignment records at USPTO

USPTO account required: This application in Patent Center · USPTO's maintenance fee lookup

Maintenance fee events come from USPTO's own fee records. Its fee lookup asks for the patent number and the application number.

The Patent Finder CompaniesExpirationsCalculatorWatchlistPricing MethodologyCorrectionsLegalPrivacysupport@thepatentfinder.com Updated Nov 27, 2026 · includes USPTO assignment data published Nov 26, 2026, status data published Nov 27, 2026 and grant & fee data published Nov 24, 2026 (weekly) Part of 137 Finder · © 2026 137 Finder LLC · Sources cited