Also listed on Sandvik Mining & Construction Australia Pty Ltd., an earlier holder on the record. The recorded assignments below show how it moved.
Term ends May 24, 2041 · High confidence
20-year base term ends Oct 26, 2040
Held by Sandvik Mining and Construction Tools AB and Sandvik Mining & Construction Australia Pty Ltd.
Filed May 5, 2022 as application 17/774,830 · Granted Jan 21, 2025
Base term plus 210 days of patent term adjustment (USPTO delay)
Today
2020
2041
Clock starts
Oct 26, 2020
Oct 26, 2020
Term ends
May 24, 2041
May 24, 2041
Granted
Jan 21, 2025
Jan 21, 2025
base term
patent term adjustment
Updated Nov 16, 2026 · includes USPTO assignment & status data published Nov 16, 2026 and grant & fee data published Nov 10, 2026 (weekly) · how we know
210
Days of term adjustment
Read from the USPTO patent term adjustment record, not recalculated here.
None
Terminal disclaimer
No disclaimer on this record.
0 of 3
Maintenance fees paid
Three maintenance fees fall due, at 3.5, 7.5 and 11.5 years from grant. This counts the ones the record shows paid.
2
Family applications on record here
Applications sharing this one's continuity chain whose file history this site holds. The family may have others.
This patent's term runs 210 days past its 20-year base term on prosecution delay. 0 of 3 maintenance fees are paid so far. Confidence: High. from the record
How we calculated this date
One row per rule, each showing its own input and what it did to the date. A step we could not verify says so instead of resolving itself.
| Step | Input | Date after this step | Confidence |
|---|---|---|---|
| Base term, 20 years from filing | Clock starts Oct 26, 2020, when application PCT/EP2020/080013, the earliest non-provisional in its chain, was filed (this one was filed May 5, 2022) | Oct 26, 2040 | High confidence |
| Continuity chain | Every parent in the chain resolved | no change | High confidence |
| Patent term adjustment | +210 days, USPTO patent term adjustment record | May 24, 2041 | High confidence |
| Terminal disclaimer cap | None on record | no cap applied | High confidence |
| Patent term extension | None on file | no change | High confidence |
| Fee events | 0 of 3 maintenance fees paid | In force | High confidence |
| Computed term end | The steps above, in order | May 24, 2041 | High confidence |
This family
| US 12,203,372 | this patent May 2041 | May 2041 |
1 of 2 applications in this family shown, earliest filings first. The applications whose file history this site holds. The family may have others.
Assignments
Assignment documents as recorded at the USPTO, oldest first, with the reel and frame each was recorded at. A recorded assignment is a filed document, not a statement of current ownership, and the absence of a later one is not evidence that the last one still stands.
| Recorded | Assignor | Assignee | Conveyance |
|---|---|---|---|
| Aug 5, 2022 Reel 61087, frame 367 | Weaver, Steven; Rataj, Mieczyslaw; Vallati, Osvaldo | Sandvik Mining and Construction Tools AB; Sandvik Mining & Construction Australia Pty Ltd. | Assignment of Assignor's Interest |
| Aug 5, 2022 reel/frame not recorded | Vallati, Osvaldo; Rataj, Mieczyslaw; Weaver, Steven | Sandvik Mining and Construction Tools AB | Assignment of Assignor's Interest |
| Aug 5, 2022 reel/frame not recorded | Vallati, Osvaldo; Rataj, Mieczyslaw; Weaver, Steven | Sandvik Mining & Construction Australia Pty Ltd. | Assignment of Assignor's Interest |
Sources
Google Patents · The patent document at USPTO · Assignment records at USPTO
USPTO account required: This application in Patent Center · USPTO's maintenance fee lookup
Maintenance fee events come from USPTO's own fee records. Its fee lookup asks for the patent number and the application number.
Free plan: 3 watched companies. Pro: unlimited.
Alerts on its grants, lapses and transfers.
What's changing
May 2041
Term ends May 24, 2041. Maintenance fees still fall due before then
Note
The 210 days of patent term adjustment (USPTO delay) are read from the USPTO record, not recalculated by us
Citations
0
later US patents cite this one
Fewer than half of the utility patents granted in 2025 in our data have been cited yet, so we show the count and do not rank on it.
How we rank
Every date shows its work: the base term, any term adjustment or extension, any disclaimer cap, and the maintenance fee record, each with a confidence tier. How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
In force means the term is running and no lapse is on record. It is not a finding that the patent is valid.