Collateral for a security interest recorded Mar 25, 2025 (JPMorgan Chase Bank, N.A.).
Term ends Feb 12, 2027 · High confidence
20-year base term ends Feb 12, 2027
Held by Taylor Made Group, LLC
Filed Feb 12, 2007 as application 11/673,760 · Granted Oct 14, 2008
Base term, 20 years from filing
Today
2007
2027
Clock starts
Feb 12, 2007
Feb 12, 2007
Term ends
Feb 12, 2027
Feb 12, 2027
Granted
Oct 14, 2008
Oct 14, 2008
base term
fee events
Updated Nov 15, 2026 · includes USPTO assignment & status data published Nov 15, 2026 and grant & fee data published Nov 10, 2026 (weekly) · how we know
None
Term adjustment
No prosecution delay on this record.
None
Terminal disclaimer
No disclaimer on this record.
3 of 3
Maintenance fees paid
Three maintenance fees fall due, at 3.5, 7.5 and 11.5 years from grant. This counts the ones the record shows paid.
This patent's term is its 20-year base term, with no adjustment for prosecution delay. All three maintenance fees are recorded paid; no more fees are due. Confidence: High. from the record
How we calculated this date
One row per rule, each showing its own input and what it did to the date. A step we could not verify says so instead of resolving itself.
| Step | Input | Date after this step | Confidence |
|---|---|---|---|
| Base term, 20 years from filing | Clock starts Feb 12, 2007, when this application, 11/673,760, was filed | Feb 12, 2027 | High confidence |
| Continuity chain | Every parent in the chain resolved | no change | High confidence |
| Patent term adjustment | None on file | no change | High confidence |
| Terminal disclaimer cap | None on record | no cap applied | High confidence |
| Patent term extension | None on file | no change | High confidence |
| Fee events | 3 of 3 maintenance fees paid | In force | High confidence |
| Computed term end | The steps above, in order | Feb 12, 2027 | High confidence |
Assignments
Assignment documents as recorded at the USPTO, oldest first, with the reel and frame each was recorded at. A recorded assignment is a filed document, not a statement of current ownership, and the absence of a later one is not evidence that the last one still stands.
| Recorded | Assignor | Assignee | Conveyance |
|---|---|---|---|
| Feb 12, 2007 Reel 18880, frame 766 | Erskine, Edward J.; Butler, Eric S.; Griffith, Douglas D. | Taylor Made Group, Inc. | Assignment of Assignor's Interest |
| Oct 16, 2009 Reel 23498, frame 623 | Taylor Made Group, Inc. A/K/A Taylor Made Group Holdings, Inc.; Taylor Made Products; Taylor Made Systems Bradenton, Inc.; Water Bonnet Manufacturing, Inc. | Taylor Made Group, LLC | Assignment of Assignor's Interest |
| Oct 22, 2009 Reel 23409, frame 278 | Taylor Made Group, LLC; Taylor Made Credit, LLC; Taylor Made Glass Ohio, LLC; Taylor Made Overseas, LLC; Water Bonnet MFG., LLC; Jwet Realty Corp.; BMKJ Realty, Inc.; Tmo Realty, LLC | Sovereign Bank, As Agent | Security Agreement |
| Apr 12, 2012 Reel 28033, frame 323 | Sovereign Bank, N.a. | Taylor Made Group, LLC; Taylor Made Credit, LLC, F/K/A Taylor Made Credit Corp.; Taylor Made Glass Ohio, LLC, F/K/A Taylor Made Glass Ohio, Inc.; Taylor Made Overseas, LLC; Tmo Realty, LLC; Jwet Realty Corp.; BMKJ Realty, Inc. | Release of Security Interest |
| Apr 12, 2012 Reel 28033, frame 482 | Taylor Made Group, LLC | White Oak Global Advisors, LLC, as Agent | Security Agreement |
| Apr 12, 2012 reel/frame not recorded | Sovereign Bank, N.a. | Taylor Made Group, LLC | Release of Security Interest |
| Apr 12, 2012 reel/frame not recorded | Sovereign Bank, N.a. | Taylor Made Credit, LLC, F/K/A Taylor Made Credit Corp. | Release of Security Interest |
| Apr 12, 2012 reel/frame not recorded | Sovereign Bank, N.a. | Taylor Made Glass Ohio, LLC, F/K/A Taylor Made Glass Ohio, Inc. | Release of Security Interest |
| Apr 12, 2012 reel/frame not recorded | Sovereign Bank, N.a. | Taylor Made Overseas, LLC | Release of Security Interest |
| Apr 12, 2012 reel/frame not recorded | Sovereign Bank, N.a. | Tmo Realty, LLC | Release of Security Interest |
| Apr 12, 2012 reel/frame not recorded | Sovereign Bank, N.a. | Jwet Realty Corp. | Release of Security Interest |
| Apr 12, 2012 reel/frame not recorded | Sovereign Bank, N.a. | BMKJ Realty, Inc. | Release of Security Interest |
| Jan 14, 2015 Reel 34762, frame 699 | Taylor Made Group, LLC | Manufacturers and Traders Trust Company | Security Interest |
| Jan 14, 2015 Reel 34763, frame 679 | White Oak Global Advisors, LLC, as Agent | Taylor Made Group, LLC | Release of Security Interest |
| Feb 2, 2018 Reel 45230, frame 567 | Manufacturers and Traders Trust Company | Taylor Made Group, LLC | Release of Security Interest |
| Mar 25, 2025 Reel 70719, frame 650 | Lippert Components, Inc.; Curt Manufacturing, LLC; Furrion, LLC; Furrion Ltd.; Innovative Design Solutions, Inc.; Kaspar Ranch Hand Equipment, LLC; Lippert Components Manufacturing, Inc.; Taylor Made Group, LLC | Jpmorgan Chase Bank, N.a. | Security Interest |
Sources
Google Patents · The patent document at USPTO · Assignment records at USPTO
USPTO account required: This application in Patent Center · USPTO's maintenance fee lookup
Maintenance fee events come from USPTO's own fee records. Its fee lookup asks for the patent number and the application number.
Free plan: 3 watched companies. Pro: unlimited.
Alerts on its grants, lapses and transfers.
What's changing
Feb 2027
Term ends Feb 12, 2027. No further fees fall due before then
Citations
5
later US patents cite this one
That is below the median of utility patents granted in 2008 in our data, the only group it is compared against.
How we rank
Every date shows its work: the base term, any term adjustment or extension, any disclaimer cap, and the maintenance fee record, each with a confidence tier. How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
In force means the term is running and no lapse is on record. It is not a finding that the patent is valid.