The Patent Finder
US

OFDM Frame Synchronisation Algorithm

US 7,706,488 In force
OverviewAssignmentsSources & methods

Term ends Apr 13, 2027 · High confidence

Filed Apr 15, 2004 as application 10/824,395 · Granted Apr 27, 2010
Base term plus 1093 days of patent term adjustment (USPTO delay)
Today
20 years from filing
2004 2027
Clock starts
Apr 15, 2004
Term ends
Apr 13, 2027
Granted
Apr 27, 2010
base term patent term adjustment fee events Updated Nov 16, 2026 · includes USPTO assignment & status data published Nov 16, 2026 and grant & fee data published Nov 10, 2026 (weekly) · how we know
1,093
Days of term adjustment
Read from the USPTO patent term adjustment record, not recalculated here.
None
Terminal disclaimer
No disclaimer on this record.
3 of 3
Maintenance fees paid
Three maintenance fees fall due, at 3.5, 7.5 and 11.5 years from grant. This counts the ones the record shows paid.

This patent's term runs 1093 days past its 20-year base term on prosecution delay. All three maintenance fees are recorded paid; no more fees are due. Confidence: High. from the record

How we calculated this date

One row per rule, each showing its own input and what it did to the date. A step we could not verify says so instead of resolving itself.
StepInputDate after this stepConfidence
Base term, 20 years from filingClock starts Apr 15, 2004, when this application, 10/824,395, was filedApr 15, 2024High confidence
Continuity chainEvery parent in the chain resolvedno changeHigh confidence
Patent term adjustment+1093 days, USPTO patent term adjustment recordApr 13, 2027High confidence
Terminal disclaimer capNone on recordno cap appliedHigh confidence
Patent term extensionNone on fileno changeHigh confidence
Fee events3 of 3 maintenance fees paidIn forceHigh confidence
Computed term endThe steps above, in orderApr 13, 2027High confidence

Assignments

Assignment documents as recorded at the USPTO, oldest first, with the reel and frame each was recorded at. A recorded assignment is a filed document, not a statement of current ownership, and the absence of a later one is not evidence that the last one still stands.
RecordedAssignorAssigneeConveyance
Apr 15, 2004
Reel 15224, frame 927
Chen, Nongi; Heaton, Robert; Tanaka, MiyukiMitsubishi Electric Information Technology Centre Europe B.V.Assignment of Assignor's Interest
Jan 6, 2005
Reel 16129, frame 357
Mitsubishi Electric Infroamtion Technology Centre Europe B.V.Mitsubishi Denki Kabushiki KaishaAssignment of Assignor's Interest
Apr 28, 2015
Reel 35516, frame 250
Mitsubishi Electric CorporationTCL Communication Technology Holdings LimitedAssignment of Assignor's Interest
May 8, 2017
Reel 42330, frame 986
TCL Communication Technology Holdings LimitedTCL Communication Technology Holdings LimitedChange of Address
Apr 23, 2019
Reel 48968, frame 807
TCL Communication Technology Holdings LimitedWing Win Consulting LimitedAssignment of Assignor's Interest
Sep 2, 2020
Reel 53666, frame 933
Wing Win Consulting LimitedTCL Communication Technology Holdings LimitedAssignment of Assignor's Interest

Sources

Google Patents · The patent document at USPTO · Assignment records at USPTO

USPTO account required: This application in Patent Center · USPTO's maintenance fee lookup

Maintenance fee events come from USPTO's own fee records. Its fee lookup asks for the patent number and the application number.

The Patent Finder CompaniesExpirationsCalculatorWatchlistPricing MethodologyCorrectionsLegalPrivacysupport@thepatentfinder.com Updated Nov 16, 2026 · includes USPTO assignment & status data published Nov 16, 2026 and grant & fee data published Nov 10, 2026 (weekly) Part of 137 Finder · © 2026 137 Finder LLC · Sources cited