Term ends Aug 5, 2032 · High confidence
20-year base term ends Jan 18, 2032
Held by Hubbell Power Systems, Inc.
Filed Jul 11, 2013 as application 13/979,215 · Granted Aug 4, 2015
Base term plus 200 days of patent term adjustment (USPTO delay)
Today
2012
2032
Clock starts
Jan 18, 2012
Jan 18, 2012
Term ends
Aug 5, 2032
Aug 5, 2032
Granted
Aug 4, 2015
Aug 4, 2015
base term
patent term adjustment
fee events
Updated Nov 15, 2026 · includes USPTO assignment & status data published Nov 15, 2026 and grant & fee data published Nov 10, 2026 (weekly) · how we know
200
Days of term adjustment
Read from the USPTO patent term adjustment record, not recalculated here.
None
Terminal disclaimer
No disclaimer on this record.
2 of 3
Maintenance fees paid
Three maintenance fees fall due, at 3.5, 7.5 and 11.5 years from grant. This counts the ones the record shows paid.
4
Family applications on record here
Applications sharing this one's continuity chain whose file history this site holds. The family may have others.
This patent's term runs 200 days past its 20-year base term on prosecution delay. 2 of 3 maintenance fees are paid so far. Confidence: High. from the record
How we calculated this date
One row per rule, each showing its own input and what it did to the date. A step we could not verify says so instead of resolving itself.
| Step | Input | Date after this step | Confidence |
|---|---|---|---|
| Base term, 20 years from filing | Clock starts Jan 18, 2012, when application PCT/US2012/021650, the earliest non-provisional in its chain, was filed (this one was filed Jul 11, 2013) | Jan 18, 2032 | High confidence |
| Continuity chain | Every parent in the chain resolved | no change | High confidence |
| Patent term adjustment | +200 days, USPTO patent term adjustment record | Aug 5, 2032 | High confidence |
| Terminal disclaimer cap | None on record | no cap applied | High confidence |
| Patent term extension | None on file | no change | High confidence |
| Fee events | 2 of 3 maintenance fees paid | In force | High confidence |
| Computed term end | The steps above, in order | Aug 5, 2032 | High confidence |
This family
| Application PCT/US2012/021650 | PCT application no patent term | no patent term |
| US 9,099,266 | this patent Aug 2032 | Aug 2032 |
| US 9,991,072 | In force Jan 2032 | Jan 2032 |
| US 10,468,213 | In force Jan 2032 | Jan 2032 |
The applications whose file history this site holds. The family may have others.
Assignments
Assignment documents as recorded at the USPTO, oldest first, with the reel and frame each was recorded at. A recorded assignment is a filed document, not a statement of current ownership, and the absence of a later one is not evidence that the last one still stands.
| Recorded | Assignor | Assignee | Conveyance |
|---|---|---|---|
| Jul 11, 2013 Reel 30777, frame 949 | Rhein, David A. | Actuant Corporation | Assignment of Assignor's Interest |
| Dec 11, 2013 Reel 31794, frame 568 | Actuant Corporation | Actuant Electrical, Inc. | Assignment of Assignor's Interest |
| Dec 11, 2013 Reel 31795, frame 121 | Actuant Electrical, Inc. | Electrical Holdings LLC | Assignment of Assignor's Interest |
| Jan 30, 2014 Reel 32140, frame 655 | Power Products, LLC | Royal Bank of Canada | Security Agreement |
| Jul 22, 2014 Reel 33379, frame 15 | Actuant Corporation | Actuant Electrical, Inc. | Corrective Assignment to Correct the Assignee Address Previously Recorded on Reel 031794 Frame 0568. Assignor(S) Hereby Confirms the Assignment of Assignors Interest. |
| Sep 19, 2014 Reel 33778, frame 301 | Electrical Holdings LLC | Power Products, LLC | Merger |
| Oct 1, 2014 Reel 33865, frame 769 | Electrical Holdings LLC | Power Products, LLC | Merger |
| Oct 1, 2014 Reel 33967, frame 682 | Electrical Holdings LLC | Power Products, LLC | Corrective Assignment to Correct the First-Listed Application Number Previously Recorded on Reel 033778 Frame 0301. Assignor(S) Hereby Confirms the First-Listed Application Number Should Be Changed from "08378879" to "08378809". |
| Feb 10, 2015 Reel 34928, frame 514 | Power Products, LLC | Hubbell Power Systems, Inc. | Assignment of Assignor's Interest |
| Feb 10, 2015 Reel 34930, frame 907 | Royal Bank of Canada | Power Products, LLC | Release of Security Interest |
| Dec 20, 2016 Reel 41038, frame 246 | Royal Bank of Canada, as Collateral Agent | Power Products, LLC | Release of Security Interest |
Sources
Google Patents · The patent document at USPTO · Assignment records at USPTO
USPTO account required: This application in Patent Center · USPTO's maintenance fee lookup
Maintenance fee events come from USPTO's own fee records. Its fee lookup asks for the patent number and the application number.
Free plan: 3 watched companies. Pro: unlimited.
Alerts on its grants, lapses and transfers.
What's changing
Aug 2032
Term ends Aug 5, 2032. Maintenance fees still fall due before then
Note
The 200 days of patent term adjustment (USPTO delay) are read from the USPTO record, not recalculated by us
Citations
9
later US patents cite this one
That is above the median of utility patents granted in 2015 in our data, the only group it is compared against.
How we rank
Every date shows its work: the base term, any term adjustment or extension, any disclaimer cap, and the maintenance fee record, each with a confidence tier. How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
In force means the term is running and no lapse is on record. It is not a finding that the patent is valid.