Also listed on Sinopec Shengli Petroleum Engineering Co., Ltd., an earlier holder on the record. The recorded assignments below show how it moved.
Term ends Feb 2, 2035 · High confidence
20-year base term ends Dec 24, 2034
Held by China Petroleum & Chemical Corporation, Sinopec Oilfield Service Corporation, Sinopec Shengli Petroleum Engineering Co., Ltd. and Drilling Fluid Technology Service Center of Sinopec Shengli Petroleum Engineering Co., Ltd.
Filed Dec 24, 2014 as application 14/582,901 · Granted Apr 10, 2018
Base term plus 40 days of patent term adjustment (USPTO delay)
Today
2014
2035
Clock starts
Dec 24, 2014
Dec 24, 2014
Term ends
Feb 2, 2035
Feb 2, 2035
Granted
Apr 10, 2018
Apr 10, 2018
base term
patent term adjustment
fee events
Updated Nov 18, 2026 · includes USPTO assignment data published Nov 17, 2026, status data published Nov 18, 2026 and grant & fee data published Nov 17, 2026 (weekly) · how we know
40
Days of term adjustment
Read from the USPTO patent term adjustment record, not recalculated here.
None
Terminal disclaimer
No disclaimer on this record.
2 of 3
Maintenance fees paid
Three maintenance fees fall due, at 3.5, 7.5 and 11.5 years from grant. This counts the ones the record shows paid.
This patent's term runs 40 days past its 20-year base term on prosecution delay. 2 of 3 maintenance fees are paid so far. Confidence: High. from the record
How we calculated this date
One row per rule, each showing its own input and what it did to the date. A step we could not verify says so instead of resolving itself.
| Step | Input | Date after this step | Confidence |
|---|---|---|---|
| Base term, 20 years from filing | Clock starts Dec 24, 2014, when this application, 14/582,901, was filed | Dec 24, 2034 | High confidence |
| Continuity chain | Every parent in the chain resolved | no change | High confidence |
| Patent term adjustment | +40 days, USPTO patent term adjustment record | Feb 2, 2035 | High confidence |
| Terminal disclaimer cap | None on record | no cap applied | High confidence |
| Patent term extension | None on file | no change | High confidence |
| Fee events | 2 of 3 maintenance fees paid | In force | High confidence |
| Computed term end | The steps above, in order | Feb 2, 2035 | High confidence |
Assignments
Assignment documents as recorded at the USPTO, oldest first, with the reel and frame each was recorded at. A recorded assignment is a filed document, not a statement of current ownership, and the absence of a later one is not evidence that the last one still stands.
| Recorded | Assignor | Assignee | Conveyance |
|---|---|---|---|
| Mar 2, 2015 reel/frame not recorded | Lan, Qiang; Li, Gongrang; Li, Zuohui; Wu, Xueqin; Xu, Yunbo; Zhang, Hong; Zhang, Peng; Zheng, Chengsheng; Zhou, Yanjun | Sinopec Oilfield Service Corporation | Assignment of Assignor's Interest |
| Mar 2, 2015 reel/frame not recorded | Lan, Qiang; Li, Gongrang; Li, Zuohui; Wu, Xueqin; Xu, Yunbo; Zhang, Hong; Zhang, Peng; Zheng, Chengsheng; Zhou, Yanjun | Drilling Technology Research Institute of Sinopec Shengli Petroleum Engineering Co., Ltd. | Assignment of Assignor's Interest |
| Mar 2, 2015 Reel 35063, frame 659 | Li, Gongrang; Lan, Qiang; Zhang, Peng; Zheng, Chengsheng; Xu, Yunbo; Wu, Xueqin; Li, Zuohui; Zhou, Yanjun; Zhang, Hong | Sinopec Oilfield Service Corporation; Drilling Technology Research Institute of Sinopec Shengli Petroleum Engineering Co., Ltd. | Assignment of Assignor's Interest |
| Jul 12, 2025 reel/frame not recorded | Drilling Technology Research Institute of Sinopec Shengli Petroleum Engineering Co., Ltd.; Sinopec Oilfield Service Corporation | China Petroleum & Chemical Corporation | Assignment of Assignor's Interest |
| Jul 12, 2025 reel/frame not recorded | Drilling Technology Research Institute of Sinopec Shengli Petroleum Engineering Co., Ltd.; Sinopec Oilfield Service Corporation | Sinopec Oilfield Service Corporation | Assignment of Assignor's Interest |
| Jul 12, 2025 reel/frame not recorded | Drilling Technology Research Institute of Sinopec Shengli Petroleum Engineering Co., Ltd.; Sinopec Oilfield Service Corporation | Sinopec Shengli Petroleum Engineering Co., Ltd. | Assignment of Assignor's Interest |
| Jul 12, 2025 reel/frame not recorded | Drilling Technology Research Institute of Sinopec Shengli Petroleum Engineering Co., Ltd.; Sinopec Oilfield Service Corporation | Drilling Fluid Technology Service Center of Sinopec Shengli Petroleum Engineering Co., Ltd. | Assignment of Assignor's Interest |
| Jul 12, 2025 Reel 71685, frame 325 | Sinopec Oilfield Service Corporation; Drilling Technology Research Institute of Sinopec Shengli Petroleum Engineering Co., Ltd. | China Petroleum & Chemical Corporation; Sinopec Oilfield Service Corporation; Sinopec Shengli Petroleum Engineering Co., Ltd.; Drilling Fluid Technology Service Center of Sinopec Shengli Petroleum Engineering Co., Ltd. | Assignment of Assignor's Interest |
Sources
Google Patents · The patent document at USPTO · Assignment records at USPTO
USPTO account required: This application in Patent Center · USPTO's maintenance fee lookup
Maintenance fee events come from USPTO's own fee records. Its fee lookup asks for the patent number and the application number.
Free plan: 3 watched companies. Pro: unlimited.
Alerts on its grants, lapses and transfers.
What's changing
Feb 2035
Term ends Feb 2, 2035. Maintenance fees still fall due before then
Note
The 40 days of patent term adjustment (USPTO delay) are read from the USPTO record, not recalculated by us
Citations
0
later US patents cite this one
That is below the median of utility patents granted in 2018 in our data, the only group it is compared against.
How we rank
Every date shows its work: the base term, any term adjustment or extension, any disclaimer cap, and the maintenance fee record, each with a confidence tier. How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
In force means the term is running and no lapse is on record. It is not a finding that the patent is valid.