158 patents currently held
10 more in force are now held by other companies
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
The next term ends in Feb 2032. from the record
Free plan: 3 watched companies. Pro: unlimited.
Alerts on its grants, lapses and transfers.
0
Ending by 2030
Feb 2032
Next term end
153
Patent families
When these terms end
Held patents by the year their term ends
notable patents
fee due within 90 days
all others
Updated Nov 15, 2026 · includes USPTO assignment & status data published Nov 15, 2026 and grant & fee data published Nov 10, 2026 (weekly) · how we know
Notable: the highest-ranked patents in this portfolio by citations and family size. Fee due within 90 days: a maintenance fee is due within 90 days of when this page was computed and not yet paid.
Notable patents
Ranked by citations and family size, against patents of the same kind granted the same year. How we rank
Notable
Ends Sep 2035 · High confidence
Also notable
Ends Oct 2035 · High confidence
Also notable
Ends Aug 2035 · Medium confidence
Wind Turbine Blade Having a Root Region with Elongated Fastening Members Provided with Metal Fibres
US 10,309,369
The most cited patent in this portfolio, cited by 25 later US patents, top 10% of utility patents granted in 2019 in our data. Protection runs to 2035.
Method and Moulding System for Manufacturing a Fibre-Reinforced Polymer Object via a Feedback System for Controlling Resin Flow Rate
US 10,479,034
The earliest of the three still in force, granted 2019 and renewed since. Its term ends first, in 2035.
Wind Turbine Blade Provided with Surface Mounted Device
US 11,746,743
Granted 2023. Computed term ends 2035.
Fee deadlines
Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
- 1 fee due Dec 4, 2026The maintenance fee for Wind Turbine Blade Having a Root Region with Elongated Fastening Members Provided with Metal Fibres (US 10,309,369) comes due Dec 4, 2026. Unpaid by Jun 4, 2027, it lapses early.
- 1 fee due Jan 7, 2027The maintenance fee for Method of Manufacturing an Oblong Shell Part and Such Shell Part (US 9,073,273) comes due Jan 7, 2027. Unpaid by Jul 7, 2027, it lapses early.
- 1 fee due Feb 8, 2027The maintenance fee for Wind Turbine Blade Provided with Surface Mounted Device (US 11,719,221) comes due Feb 8, 2027. Unpaid by Aug 9, 2027, it lapses early.
- 1 fee due Mar 5, 2027The maintenance fee for Wind Turbine Blade Provided with Surface Mounted Device (US 11,746,743) comes due Mar 5, 2027. Unpaid by Sep 7, 2027, it lapses early.
- 7 fees due Apr 3 to 29, 2027 · next Apr 3
- 2 fees due May 19 to 26, 2027 · next May 19
- 4 fees due Jun 5 to 24, 2027 · next Jun 5
- 4 fees due Jul 9 to 30, 2027 · next Jul 9
- 1 fee due Aug 13, 2027The maintenance fee for A Wind Turbine Blade Measurement System and a Method of Improving Accuracy of a Wind Turbine Blade Measurement System (US 11,898,535) comes due Aug 13, 2027. Unpaid by Feb 14, 2028, it lapses early.
- 4 fees due Sep 12 to 26, 2027 · next Sep 12
- 1 fee due Oct 30, 2027The maintenance fee for Manufacturing a Wind Turbine Blade Shell Part (US 11,971,009) comes due Oct 30, 2027. Unpaid by May 1, 2028, it lapses early.
- 2 fees due Nov 7 to 14, 2027 · next Nov 7
Recent changes
- Nov 4Assignment recorded on 1 record: Herrig, Andreas and 2 others to LM Wind Power A/S Recorded Nov 4, 2026, executed Feb 17, 2026. Conveyance as recorded: Assignment of Assignor's Interest. A recorded assignment is a filed document, not a statement of current ownership. Reel 76623, frame 816.
- Nov 4Assignment recorded on 1 record: LM Wind Power A/S to GE Vernova Infrastructure Technology LLC Recorded Nov 4, 2026, executed Sep 25, 2026. Conveyance as recorded: Assignment of Assignor's Interest. A recorded assignment is a filed document, not a statement of current ownership. Reel 76624, frame 479.
- 10 of the patents on this record were granted since Aug 17, 2026
What they patent
The 5 largest of its 153 families, grouped by real patent family and labeled by the earliest filing in each. No technology classification is inferred from titles.
| Leading Edge Protection for a Wind Turbine Blade | 2 in force | to Aug 2042 |
| Serrated Trailing Edge Panel for a Wind Turbine Blade | 2 in force | to Feb 2037 |
| Method and Moulding System for Manufacturing a Fibre-Reinforced Polymer Object via a Feedback System for Controlling Resin Flow Rate | 2 in force | to Oct 2035 |
| Wind Turbine Blade Provided with Surface Mounted Device | 2 in force | to Aug 2035 |
| Method and System for Transporting and Storing At Least Two Wind Turbine Blades | 2 in force | to Dec 2033 |
Patents held now
Soonest term end first.
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 8,578,604 | Method of Attaching a Repair Platform to a Wind Turbine In force · High confidence | In force | High confidence | |
| US 9,211,680 | Loading Apparatus and Method of Loading Rolls of Fibre Based Sheet Material to an Application Unit In force · High confidence | In force | High confidence | |
| US 9,358,996 | Blade Cart for a Wind Turbine Blade In force · High confidence | In force | High confidence | |
| US 9,399,983 | Wind Turbine Blade with Cross-Sectional Sensors In force · High confidence | In force | High confidence | |
| US 11,203,169 | Method and Moulding System for Manufacturing a Fibre-Reinforced Polymer Object via a Feedback System for Controlling Resin Flow Rate In force · High confidence | In force | High confidence | |
| US 10,974,818 | Vortex Generator Arrangement for an Airfoil In force · High confidence | In force | High confidence | |
| US 9,551,317 | Wind Turbine Blade with Elongated Fastening Members in the Root Region Thereof In force · High confidence | In force | High confidence | |
| US 10,589,941 | Method and System for Transporting and Storing at Least Two Wind Turbine Blades In force · High confidence | In force | High confidence | |
| US 9,709,025 | Method and System for Transporting and Storing At Least Two Wind Turbine Blades In force · High confidence | In force | High confidence | |
| US 9,617,974 | Wind Turbine Blade In force · High confidence | In force | High confidence |
Also on record, not counted in the 158: 10 patents in force now held by others · 88 applications pending · 30 applications abandoned. List them
Sources and methods
Compiled from USPTO application file histories, grants and recorded assignments, with the company's own names reviewed by hand. How this record was built
Portfolio grouped automatically from ownership conveyances to the names matched to this company, usually every name that begins with its own, so it counts patents an affiliate holds; each list row names the holder of record. Security interests are excluded and ambiguous records are not reviewed by hand.
Fee due within 90 days marks a patent with a maintenance fee due within 90 days of the date this page was computed and not yet recorded paid, so it can end earlier than the bar shows. A fee left unpaid ends the patent at the close of the six month grace period that follows its due date, not on the due date itself. It is not a prediction that the fee will be missed.
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.