Nordex Energy Spain, S.A.U.
4 more in force are now held by other companies
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
0
Ending by 2030
Jul 2038
Next term end
When these terms end
Held patents by the year their term ends
20262027202820292030203120322033203420352036203720382039204020412042204320442045
Fee deadlines
Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
- 1 fee due Mar 26, 2027The maintenance fee for Wind turbine blade (US 11,767,818) comes due Mar 26, 2027. Unpaid by Sep 27, 2027, it lapses early.
- 1 fee due May 21, 2027The maintenance fee for Method for assembling a wind turbine and wind turbine assembled according to said method (US 11,821,403) comes due May 21, 2027. Unpaid by Nov 22, 2027, it lapses early.
- 1 fee due Sep 19, 2027The maintenance fee for Method and device to extend the life cycle of a wind turbine (US 11,933,268) comes due Sep 19, 2027. Unpaid by Mar 20, 2028, it lapses early.
- 1 fee due Nov 5, 2027The maintenance fee for Pre-assembly slab system for concrete wind turbine towers and method for assembling a pre-assembly slab system for concrete wind turbine towers (US 10,641,247) comes due Nov 5, 2027. Unpaid by May 5, 2028, it lapses early.
Recent changes
- 1 of the patents on this record was granted since Aug 24, 2026
- Sep 1 US 12,723,426 Post-Tensioning System for a Tower of a Wind Turbine, Post-Tensioned Tower of a Wind Turbine and Method of Post-Tensioning a Tower of a Wind Turbine
Patents held now
Soonest term end first. Each date below is computed on that patent's own page, which shows the rule, the adjustments and the fee history it was derived from.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 10,641,247 | Pre-assembly slab system for concrete wind turbine towers and method for assembling a pre-assembly slab system for concrete wind turbine towers In force · USPTO record | In force | USPTO record | |
| US 10,935,000 | Tool for Transporting a Wind Turbine Power Train Subset In force · High confidence | In force | High confidence | |
| US 10,895,089 | Wind turbine tower with reinforcing elements In force · USPTO record | In force | USPTO record | |
| US 10,954,918 | Method for operating electrical machines In force · USPTO record | In force | USPTO record | |
| US 11,434,873 | Method for operating electrical machines In force · USPTO record | In force | USPTO record | |
| US 11,359,609 | Anchor cage for a foundation of a wind turbine, assembly method thereof and foundation of a wind turbine In force · USPTO record | In force | USPTO record | |
| US 11,933,268 | Method and device to extend the life cycle of a wind turbine In force · USPTO record | In force | USPTO record | |
| US 11,326,578 | Wind farm control system and associated method In force · USPTO record | In force | USPTO record | |
| US 11,448,185 | Control system of a wind turbine and associated method In force · USPTO record | In force | USPTO record | |
| US 11,821,403 | Method for assembling a wind turbine and wind turbine assembled according to said method In force · USPTO record | In force | USPTO record |
Also on record, not counted in the 22: 4 patents in force now held by others. List them
Sources and methods
Compiled from the USPTO record, grants, published applications and recorded assignments, not yet reviewed by hand.
How this record was built
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.
Published applications
US patent applications published under this name that have not become patents. An application is published about eighteen months after its earliest filing; one that has not been published is in no public record.
4 pending