Siemens Gamesa Renewable Energy A/S
Every in-force patent on Siemens Gamesa Renewable Energy A/S's record whose computed term ends in 2033, whoever holds it now. Soonest term end first, then patent number.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Holder | Status | Expires | Confidence |
|---|---|---|---|---|---|
| US 9,601,974 | Armature Assembly Apparatus In force · High confidence | Siemens Gamesa Renewable Energy A/S | In force | High confidence | |
| US 8,922,056 | Power Interchange system for interchanging electric energy between a battery and an electric grid, method for interchanging electric energy between a battery and an electric grid and application of the power interchange system In force · High confidence | Siemens Gamesa Renewable Energy A/S | In force | High confidence | |
| US 9,151,327 | Backup Lubrication System for a Rotor Bearing In force · High confidence | Siemens Gamesa Renewable Energy A/S | In force | High confidence | |
| US 8,890,348 | Nacelle for a Wind Turbine Grace period ended Nov 18, 2026 · lapse expected · Low confidence | Siemens Gamesa Renewable Energy A/S | Grace period ended Nov 18, 2026 lapse expected | Low confidence | |
| US 9,583,981 | Armature Assembly, Armature Ring Segment and an Armature Handling Appartus for a Generator Having Insertion Interface Elements for Mounting to Complementary Receiving Interface Elements In force · High confidence | Siemens Gamesa Renewable Energy A/S | In force | High confidence | |
| US 9,375,861 | Tower In force · High confidence | Siemens Gamesa Renewable Energy A/S | In force | High confidence | |
| US 8,920,120 | Arrangement with a nacelle and a radiator arrangement In force · High confidence | Siemens Gamesa Renewable Energy A/S | In force | High confidence | |
| US 8,963,361 | Method to Rotate the Rotor of a Wind Turbine and Means to Use in This Method In force · High confidence | Siemens Gamesa Renewable Energy A/S | In force | High confidence | |
| US 9,333,712 | Method of Producing a Fibre Reinforced Structure In force · High confidence | Siemens Gamesa Renewable Energy A/S | In force | High confidence | |
| US 8,882,466 | Rotor Blade Assembly Grace period ended Nov 11, 2026 · lapse expected · Low confidence | Siemens Gamesa Renewable Energy A/S | Grace period ended Nov 11, 2026 lapse expected | Low confidence | |
| 39 more term ends in 2033 · Pro | |||||
10 of 49 patents shown. Soonest term end first, then patent number.
Pro members see all 49.
Updated Nov 25, 2026 · includes USPTO assignment data published Nov 24, 2026, status data published Nov 25, 2026 and grant & fee data published Nov 24, 2026 (weekly) · how we know
Every US patent term ending in 2033
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.