Previously recorded as Siemens Wind Power A/S (to 2019)
767 patents currently held
6 more in force are now held by other companies
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
The next US patent term in the Siemens Gamesa Renewable Energy A/S portfolio ends in Dec 2026, and more of its terms end in 2041 (128) than in any other year. from the record
Free plan: 3 watched companies. Pro: unlimited.
Alerts on its grants, lapses and transfers.
40
Ending by 2030
Dec 2026
Next term end
749
Patent families
When these terms end
Held patents by the year their term ends
notable patents
fee due within 90 days
all others
Updated Nov 23, 2026 · includes USPTO assignment data published Nov 22, 2026, status data published Nov 23, 2026 and grant & fee data published Nov 17, 2026 (weekly) · how we know
Notable: the highest-ranked patents in this portfolio by citations and family size. Fee due within 90 days: a maintenance fee is due within 90 days of when this page was computed and not yet paid.
Notable patents
Ranked by citations and family size, against patents of the same kind granted the same year. How we rank
Notable
Ends Sep 2035 · High confidence
Also notable
Ends Sep 2031 · High confidence
Also notable
Ends Sep 2031 · High confidence
Also notable
Ends Mar 2035 · High confidence
Also notable
Ends Aug 2030 · High confidence
Also notable
Ends May 2038 · High confidence
Also notable
Ends Oct 2038 · High confidence
Also notable
Ends Jun 2029 · High confidence
Charging System with a High Temperature Thermal Energy Exchange System and Method for Charging Heat Storage Material of the High Temperature Thermal Energy Exchange System with Thermal Energy
US 10,724,805
The most cited patent in this portfolio, cited by 70 later US patents, top 5% of utility patents granted in 2020 in our data. Protection runs to 2035.
Thermal Energy Storage and Recovery Device and System Having a Heat Exchanger Arrangement Using a Compressed Gas
US 8,991,183
Cited by 60 later US patents, top 10% of utility patents granted in 2015 in our data, and renewed at every maintenance window due so far. Protection runs to 2031.
Arrangement to ensure an air gap in an electric machine
US 8,536,753
Renewed at every maintenance window since the 2013 grant; no more fees are due before its term ends in 2031.
Power Plant with Steam Cycle and with a High Temperature Thermal Energy Exchange System and Method for Manufacturing the Power Plant
US 10,247,044
Cited by 41 later US patents, top 10% of utility patents granted in 2019 in our data. Protection runs to 2035.
Wind Turbine Blade with an Integrated Lightning Conductor
US 8,191,255
Cited by 26 later US patents, top 25% of utility patents granted in 2012 in our data, and renewed at 3 of 3 maintenance windows. Protection runs to 2030.
Method for Load Reduction on Wind Turbine Blade Pitch Bearings
US 11,306,699
Cited by 5 later US patents, top 25% of utility patents granted in 2022 in our data. Protection runs to 2038.
Transport Assembly
US 11,506,179
Granted 2022. Computed term ends 2038.
Mould and Method for Vacuum Assisted Resin Transfer Moulding
US 7,980,840
Renewed at every maintenance window since the 2011 grant; no more fees are due before its term ends in 2029.
Fee deadlines
Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
- 1 fee due Nov 30, 2026The maintenance fee for Lubricant Dispenser for a Wind Turbine (US 11,662,059) comes due Nov 30, 2026. Unpaid by Jun 1, 2027, it lapses early.
- 8 fees due Dec 2 to 27, 2026 · next Dec 2
- 6 fees due Jan 4 to 30, 2027 · next Jan 4
- 25 fees due Feb 1 to 28, 2027 · next Feb 1
- 21 fees due Mar 1 to 29, 2027 · next Mar 1
- 12 fees due Apr 1 to 27, 2027 · next Apr 1
- 12 fees due May 3 to 28, 2027 · next May 3
- 10 fees due Jun 1 to 26, 2027 · next Jun 1
- 18 fees due Jul 2 to 30, 2027 · next Jul 2
- 11 fees due Aug 2 to 27, 2027 · next Aug 2
- 18 fees due Sep 1 to 30, 2027 · next Sep 1
- 19 fees due Oct 2 to 30, 2027 · next Oct 2
- 4 fees due Nov 10 to 21, 2027 · next Nov 10
Recent changes
- Nov 10Assignment recorded on 1 record: Pedersen, Jesper Bjerre and 1 other to Siemens Gamesa Renewable Energy A/S Recorded Nov 10, 2026, executed Jul 24, 2026. Conveyance as recorded: Assignment of Assignor's Interest. A recorded assignment is a filed document, not a statement of current ownership. Reel 76700, frame 61.
- Nov 5Assignment recorded on 1 record: Mimo, Matteo and 1 other to Siemens Gamesa Renewable Energy A/S Recorded Nov 5, 2026, executed May 14, 2025. Conveyance as recorded: Assignment of Assignor's Interest. A recorded assignment is a filed document, not a statement of current ownership. Reel 76646, frame 342.
- 16 of the patents on this record were granted since Aug 25, 2026
- 21 terms have ended since Aug 25, 2026
- Oct 21 US 8,866,323 Method and Arrangement for Responding to a Grid Event, Such as Fast Under Frequency Combining Demand Response, Inertial Response and Spinning Reserve · lapsed on the fee record
- Oct 16 US 10,100,811 Noise Control for a Wind Turbine · lapsed on the fee record
- Oct 14 US 8,860,277 Stator coil segment for an electro mechanical transducer, in particular a generator and electro mechanical transducer, in particular electric generator · lapsed on the fee record
- Oct 11 US 11,466,664 Safety Stop Assembly · lapsed on the fee record
- Oct 7 US 8,854,017 Method and System for Controlling a Generator · lapsed on the fee record
- Oct 7 US 8,854,015 Current Controller and Generator System · lapsed on the fee record
- Sep 30 US 8,847,456 Arrangement to Ensure an Air Gap in an Electric Machine · lapsed on the fee record
- Sep 30 US 8,845,248 Transport structure and methods for transporting and/or lifting a large scale generator · lapsed on the fee record
- Sep 23 US 8,841,791 Access Means for an Electrical Machine · lapsed on the fee record
- Sep 23 US 8,839,943 Conveyor Apparatus for an Assembly Line · lapsed on the fee record
- Sep 20 US 11,448,197 Modular Tool · lapsed on the fee record
- Sep 13 US 11,441,547 Bearing Arrangement for a Wind Turbine and Wind Turbine · lapsed on the fee record
- Sep 13 US 11,441,546 Nacelle Cover for Improving Lightning Protection · lapsed on the fee record
- Sep 9 US 8,829,752 Synchronous Permanent Magnet Machine · lapsed on the fee record
- Sep 9 US 8,829,699 Rotational Speed Control of a Wind Turbine Based on Rotor Acceleration · lapsed on the fee record
What they patent
The largest of its 749 families, grouped by real patent family and labeled by the earliest filing in each. No technology classification is inferred from titles.
Patents held now
Soonest term end first.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 8,330,431 | Method for Smoothing Alternating Electric Current from a Number of Power Generating Units and Wind Power Plant Including a Number of Wind Mills with Variable Rotational Speed In force · Medium confidence | In force | Medium confidence | |
| US 8,966,753 | Method for Mounting Wind Turbine Blades to a Wind Turbine Hub In force · Medium confidence | In force | Medium confidence | |
| US 9,009,964 | Device for Mounting of Wind Turbine Blades In force · Medium confidence | In force | Medium confidence | |
| US 7,800,242 | Wind Energy Installation and Method of Controlling the Output Power from a Wind Energy Installation In force · High confidence | In force | High confidence | |
| US 8,000,840 | Method of Start Up at Least a Part of a Wind Power Plant, Wind Power Plant and Use of the Wind Power Plant In force · High confidence | In force | High confidence | |
| US 7,980,827 | Method and Connecting Piece for Assembling an Arm, Preferably a Windmill Arm, in Sections In force · High confidence | In force | High confidence | |
| US D717,729 | Wind Turbine In force · High confidence | In force | High confidence | |
| US D717,730 | Wind Turbine In force · High confidence | In force | High confidence | |
| US 8,250,833 | Wind Turbine Tower and Method for Constructing a Wind Turbine Tower In force · High confidence | In force | High confidence | |
| US 8,056,203 | System for Transportation of Blades on Railcars In force · High confidence | In force | High confidence |
Also on record, not counted in the 767: 6 patents in force now held by others · 265 patents ended · 171 applications pending · 187 applications abandoned. List them
Sources and methods
Compiled from USPTO application file histories, grants and recorded assignments, with the company's own names reviewed by hand. How this record was built
Portfolio grouped automatically from ownership conveyances to the names matched to this company, usually every name that begins with its own, so it counts patents an affiliate holds; each list row names the holder of record. Security interests are excluded and ambiguous records are not reviewed by hand.
Fee due within 90 days marks a patent with a maintenance fee due within 90 days of the date this page was computed and not yet recorded paid, so it can end earlier than the bar shows. A fee left unpaid ends the patent at the close of the six month grace period that follows its due date, not on the due date itself. It is not a prediction that the fee will be missed.