99 patents currently held
1 more in force is now held by another company
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
The next US patent term in the Siemens Gamesa Renewable Energy Service GmbH portfolio ends in Feb 2027, and more of its terms end in 2030 (12) than in any other year. from the record
Free plan: 3 watched companies. Pro: unlimited.
Alerts on its grants, lapses and transfers.
26
Ending by 2030
Feb 2027
Next term end
97
Patent families
When these terms end
Held patents by the year their term ends
notable patents
fee due within 90 days
all others
Updated Nov 25, 2026 · includes USPTO assignment data published Nov 24, 2026, status data published Nov 25, 2026 and grant & fee data published Nov 24, 2026 (weekly) · how we know
Notable: the highest-ranked patents in this portfolio by citations and family size. Fee due within 90 days: a maintenance fee is due within 90 days of when this page was computed and not yet paid.
Notable patents
Ranked by citations and family size, against patents of the same kind granted the same year. How we rank
Notable
Ends Feb 2029 · High confidence
Also notable
Ends Feb 2029 · High confidence
Also notable
Ends Jan 2031 · Medium confidence
Also notable
Ends Mar 2029 · High confidence
Also notable
Ends Jul 2028 · High confidence
Also notable
Ends Sep 2029 · High confidence
Also notable
Ends Apr 2030 · High confidence
Also notable
Ends Jan 2030 · High confidence
Wind Turbine and Tower or Tower Segment and Door Frame Therefor
US 9,347,236
Cited by 22 later US patents, top 25% of utility patents granted in 2016 in our data, and renewed at every maintenance window due so far. Protection runs to 2029.
Method for Operating a Wind Power Plant with Excess Voltagein the Grid
US 8,692,419
Cited by 41 later US patents, top 25% of utility patents granted in 2014 in our data, and renewed at 3 of 3 maintenance windows. Protection runs to 2029.
Wind Turbine Rotor Blade Components and Machine for Making Same
US 10,137,542
A family of 10 related applications built on the 2018 grant. Protection runs to 2031. A terminal disclaimer caps this term to an earlier patent's.
Calibration Method
US 8,157,522
Cited by 31 later US patents, top 25% of utility patents granted in 2012 in our data, and renewed at 3 of 3 maintenance windows. Protection runs to 2029.
Method for Operating a Wind Energy Installation
US 8,169,097
Cited by 25 later US patents, top 25% of utility patents granted in 2012 in our data, and renewed at 3 of 3 maintenance windows. Protection runs to 2028.
Wind Park with Voltage Regulation of the Wind Energy Systems and Operating Method
US 8,373,291
Cited by 28 later US patents, top 25% of utility patents granted in 2013 in our data, and renewed at 3 of 3 maintenance windows. Protection runs to 2029.
Wind Energy Installation Having a Double-Energized Asynchronous Generator and Converter Control
US 8,400,003
Cited by 27 later US patents, top 25% of utility patents granted in 2013 in our data, and renewed at 3 of 3 maintenance windows. Protection runs to 2030.
Wind Energy Installation with Negative Sequence System Regulation and Operating Method
US 8,390,138
Cited by 27 later US patents, top 25% of utility patents granted in 2013 in our data, and renewed at 3 of 3 maintenance windows. Protection runs to 2030.
Fee deadlines
Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
- 1 fee due Dec 6, 2026The maintenance fee for Wind Energy Installation and a Method of Operating a Wind Energy Installation (US 11,668,282) comes due Dec 6, 2026. Unpaid by Jun 7, 2027, it lapses early.
- 1 fee due Jan 16, 2027The maintenance fee for Direct Mold for Rotor Blades for Wind Turbines (US 10,352,295) comes due Jan 16, 2027. Unpaid by Jul 16, 2027, it lapses early.
- 2 fees due Mar 3 to 5, 2027 · next Mar 3
- 3 fees due Apr 3 to 29, 2027 · next Apr 3
- 2 fees due May 3 to 17, 2027 · next May 3
- 1 fee due Jul 2, 2027The maintenance fee for Method for Operating a Wind Turbine, Wind Turbine, and Computer Program Product (US 11,859,594) comes due Jul 2, 2027. Unpaid by Jan 3, 2028, it lapses early.
- 2 fees due Aug 13 to 27, 2027 · next Aug 13
- 2 fees due Sep 5 to 26, 2027 · next Sep 5
- 3 fees due Oct 12 to 28, 2027 · next Oct 12
- 3 fees due Nov 7 to 24, 2027 · next Nov 7
Recent changes
- 3 terms have ended since Aug 27, 2026
- Nov 4 US 8,876,483 Wind Turbine Rotor Blade Components and Methods of Making Same · lapsed on the fee record
- Oct 16 US 10,100,808 Rotor Blade Extension Body and Wind Turbine · lapsed on the fee record
- Sep 4 US 10,066,491 Fibre Composite Component for the Rotor Blade of a Wind Turbine · lapsed on the fee record
What they patent
The largest of its 97 families, grouped by real patent family and labeled by the earliest filing in each. No technology classification is inferred from titles.
Patents held now
Soonest term end first.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 7,470,111 | Wind Turbine In force · High confidence | In force | High confidence | |
| US 8,169,097 | Method for Operating a Wind Energy Installation In force · High confidence | In force | High confidence | |
| US 7,830,030 | Method for Operating a Wind Energy System In force · High confidence | In force | High confidence | |
| US 9,416,767 | Erecting a Wind Powerplant In force · High confidence | In force | High confidence | |
| US 8,123,485 | Rotor Hub of a Wind Energy Plant In force · High confidence | In force | High confidence | |
| US 9,175,491 | Wind Power Installation and a Tower or Tower Segment and a Door Frame for It In force · High confidence | In force | High confidence | |
| US 9,347,236 | Wind Turbine and Tower or Tower Segment and Door Frame Therefor In force · High confidence | In force | High confidence | |
| US 8,692,419 | Method for Operating a Wind Power Plant with Excess Voltagein the Grid In force · High confidence | In force | High confidence | |
| US 8,157,522 | Calibration Method In force · High confidence | In force | High confidence | |
| US 8,405,237 | Energy Supply for a Blade Adjustment Device Pertaining to a Wind Energy Installation In force · High confidence | In force | High confidence |
Also on record, not counted in the 99: 1 patent in force now held by others · 51 patents ended · 13 applications abandoned. List them
Sources and methods
Compiled from USPTO application file histories, grants and recorded assignments, with the company's own names reviewed by hand. How this record was built
Portfolio grouped automatically from ownership conveyances to the names matched to this company, usually every name that begins with its own, so it counts patents an affiliate holds; each list row names the holder of record. Security interests are excluded and ambiguous records are not reviewed by hand.
Fee due within 90 days marks a patent with a maintenance fee due within 90 days of the date this page was computed and not yet recorded paid, so it can end earlier than the bar shows. A fee left unpaid ends the patent at the close of the six month grace period that follows its due date, not on the due date itself. It is not a prediction that the fee will be missed.
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.