Method for Operating a Wind Power Plant with Excess Voltagein the Grid

US 8,692,419 In force
OverviewFamilyAssignmentsSources & methods

Term ends Feb 11, 2029 · High confidence

Filed Oct 12, 2009 as application 12/595,544 · Granted Apr 8, 2014
Base term plus 356 days of patent term adjustment (USPTO delay)
Today
20 years from filing
2008 2029
Clock starts
Feb 21, 2008
Term ends
Feb 11, 2029
Granted
Apr 8, 2014
base term patent term adjustment fee events Updated Nov 16, 2026 · includes USPTO assignment & status data published Nov 16, 2026 and grant & fee data published Nov 10, 2026 (weekly) · how we know
356
Days of term adjustment
Read from the USPTO patent term adjustment record, not recalculated here.
None
Terminal disclaimer
No disclaimer on this record.
3 of 3
Maintenance fees paid
Three maintenance fees fall due, at 3.5, 7.5 and 11.5 years from grant. This counts the ones the record shows paid.
2
Family applications on record here
Applications sharing this one's continuity chain whose file history this site holds. The family may have others.

This patent's term runs 356 days past its 20-year base term on prosecution delay. All three maintenance fees are recorded paid; no more fees are due. Confidence: High. from the record

How we calculated this date

One row per rule, each showing its own input and what it did to the date. A step we could not verify says so instead of resolving itself.
StepInputDate after this stepConfidence
Base term, 20 years from filingClock starts Feb 21, 2008, when application PCT/EP2008/001337, the earliest non-provisional in its chain, was filed (this one was filed Oct 12, 2009)Feb 21, 2028High confidence
Continuity chainEvery parent in the chain resolvedno changeHigh confidence
Patent term adjustment+356 days, USPTO patent term adjustment recordFeb 11, 2029High confidence
Terminal disclaimer capNone on recordno cap appliedHigh confidence
Patent term extensionNone on fileno changeHigh confidence
Fee events3 of 3 maintenance fees paidIn forceHigh confidence
Computed term endThe steps above, in orderFeb 11, 2029High confidence

This family

US 8,692,419this patent
Feb 2029
Feb 2029
1 of 2 applications in this family shown, earliest filings first. The applications whose file history this site holds. The family may have others.

Assignments

Assignment documents as recorded at the USPTO, oldest first, with the reel and frame each was recorded at. A recorded assignment is a filed document, not a statement of current ownership, and the absence of a later one is not evidence that the last one still stands.
RecordedAssignorAssigneeConveyance
Oct 13, 2009
Reel 23365, frame 116
Fortmann, Jens; Letas, Heinz-hermannRepower Systems AGAssignment of Assignor's Interest
Jan 16, 2014
Reel 32040, frame 136
Rewpower Systems AGRepower Systems SEChange of Name
Jan 23, 2015
Reel 34806, frame 74
Repower Systems SESenvion SEChange of Name
Jul 18, 2022
Reel 60692, frame 328
Senvion SESenvion AGChange of Name
Aug 3, 2022
Reel 61068, frame 1
Senvion AGSenvion GmbHChange of Name
Sep 16, 2022
Reel 61462, frame 567
Senvion GmbHSenvion Deutschland GmbHChange of Name
Oct 20, 2022
Reel 64371, frame 624
Senvion Deutschland GmbHSiemens Gamesa Renewable Energy Service GmbHChange of Name
Aug 31, 2023
Reel 64834, frame 873
Siemens Gamesa Renewable Energy Service GmbHSiemens Gamesa Renewable Energy Service GmbHChange of Address

Sources

Google Patents · The patent document at USPTO · Assignment records at USPTO

USPTO account required: This application in Patent Center · USPTO's maintenance fee lookup

Maintenance fee events come from USPTO's own fee records. Its fee lookup asks for the patent number and the application number.

The Patent Finder CompaniesExpirationsCalculatorWatchlistPricing MethodologyCorrectionsLegalPrivacysupport@thepatentfinder.com Updated Nov 16, 2026 · includes USPTO assignment & status data published Nov 16, 2026 and grant & fee data published Nov 10, 2026 (weekly) Part of 137 Finder · © 2026 137 Finder LLC · Sources cited